Over the last few years, UK research centres have provided significant computing resources for many high-energy physics collaborations under the guidance of the GridPP project. This paper reviews recent progress in the Grid deployment and operations area including findings from recent experiment and infrastructure service challenges. These results are discussed in the context of how GridPP is dealing with the important areas of networking, data storage and user education and support. Throughout, the paper offers feedback on observed successes and problems with the gLite middleware, grid usage and the experiment specific software which is required to make the Grid usable. The paper ends with a discussion of the decisions being taken to ensure a stable service and project through LHC startup until GridPP funding ends in 2011, including a brief discussion on monitoring and meeting the strict WLCG availability targets.
GridPP: development of the UK computing Grid for particle physics
J. Phys. G: Nucl. Part. Phys. 32 (2006) N1–N20 doi:10.1088/0954-3899/32/1/N01
RESEARCH NOTE FROM COLLABORATION
GridPP: development of the UK computing Grid for
particle physics
The GridPP Collaboration
P J W Faulkner1, L S Lowe1, C L A Tan1, P M Watkins1, D S Bailey2,
T A Barrass2, N H Brook2, R J H Croft2, M P Kelly2, C K Mackay2,
S Metson2, O J E Maroney2, D M Newbold2, F F Wilson2, P R Hobson3,
A Khan3, P Kyberd3, J J Nebrensky3, M Bly4, C Brew4, S Burke4,
R Byrom4, J Coles4, L A Cornwall4, A Djaoui4, L Field 4, S M Fisher4,
G T Folkes4, N I Geddes4, J C Gordon4, S J C Hicks4, J G Jensen4,
G Johnson4, D Kant4, D P Kelsey4, G Kuznetsov4, J Leake 4,
R P Middleton4, G N Patrick4, G Prassas4, B J Saunders4, D Ross4,
R A Sansum4, T Shah4, B Strong4, O Synge4, R Tam4, M Thorpe4,
S Traylen4, J F Wheeler4, N G H White4, A J Wilson4, I Antcheva5,
E Artiaga5, J Beringer5, I G Bird5, J Casey5, A J Cass5, R Chytracek5,
M V Gallas Torreira5, J Generowicz5, M Girone5, G Govi5, F Harris5,
M Heikkurinen5, A Horvath5, E Knezo5, M Litmaath5, M Lubeck5,
J Moscicki5, I Neilson5, E Poinsignon5, W Pokorski5, A Ribon5, Z Sekera5,
D H Smith5, W L Tomlin5, J E van Eldik5, J Wojcieszuk5, F M Brochu6,
S Das6, K Harrison6, M Hayes6, J C Hill6, C G Lester6, M J Palmer6,
M A Parker6, M Nelson7, M R Whalley7, E W N Glover7, P Anderson8,
P J Clark8, A D Earl8, A Holt8, A Jackson8, B Joo8, R D Kenway8,
C M Maynard8, J Perry8, L Smith8, S Thorn8, A S Trew8, W H Bell9,
M Burgon-Lyon9, D G Cameron9, A T Doyle9, A Flavell9, S J Hanlon9,
D J Martin9, G McCance 9, A P Millar9, C Nicholson9, S K Paterson9,
A Pickford9, P Soler9, F Speirs9, R St Denis9, A S Thompson9, D Britton10,
W Cameron10, D Colling10, G Davies10, P Dornan10, U Egede10,
K Georgiou10, P Lewis10, B MacEvoy10, S Marr10, J Martyniak10,
H Tallini10, S Wakefield10, R Walker10, I A Bertram11,
E Bouhova-Thacker11, D Evans 11, R C W Henderson11, R W L Jones11,
P Love11, S Downing12, M P George12, A C Irving12, C McNeile12,
Z Sroczynski12, M Tobin12, A J Washbrook12, R J Barlow13, S Dallison13,
G Fairey13, A Forti13, R E Hughes-Jones13, M A S Jones13, S Kaushal13,
R Marshall13, A McNab13, S Salih13, J C Werner13, V Bartsch14,
C Cioffi14, P Gronbech14, N Harnew14, J F Harris14, B T Huffman14,
M Leslie14, I McArthur14, R Newman14, A Soroko14, I Stokes-Rees14,
S Stonjek 14, J Tseng14, D Waters 14, G Wilkinson14, T R Arter15,
R A Cordenonsi15, A S Datta15, T Hartin15, S L Lloyd15, A J Martin15,
S E Pearce15, C J Williams15, M Gardner16, S George16, B J Green16,
S Johal16, G Rybkine16, J A Strong16, P Teixeira-Dias16, P Hodgson17,
M Robinson17, D R Tovey17, N J C Spooner17, C R Allton18, W Armour18,
P Clarke19, P Mealor19, D Waters19, B Waugh19 and B West19
0954-3899/06/010001+20$30.00 © 2006 IOP Publishing Ltd Printed in the UK N1
1 University of Birmingham, UK
2 University of Bristol, UK
3 Brunel University, UK
4 CCLRC, UK
5 CERN, Switzerland
6 University of Cambridge, UK
7 University of Durham, UK
8 University of Edinburgh, UK
9 University of Glasgow, UK
10 Imperial College, University of London, UK
11 Lancaster University, UK
12 University of Liverpool, UK
13 University of Manchester, UK
14 University of Oxford, UK
15 Queen Mary, University of London, UK
16 Royal Holloway College, University of London, UK
17 University of Sheffield, UK
18 University of Wales Swansea, UK
19 University College London, UK
Received 6 April 2005
Published 29 November 2005
Online at stacks.iop.org/JPhysG/32/N1
Abstract
The GridPP Collaboration is building a UK computing Grid for particle physics,
as part of the international effort towards computing for the Large Hadron
Collider. The project, funded by the UK Particle Physics and Astronomy
Research Council (PPARC), began in September 2001 and completed its
first phase 3 years later. GridPP is a collaboration of approximately 100
researchers in 19 UK university particle physics groups, the Council for the
Central Laboratory of the Research Councils and CERN, reflecting the strategic
importance of the project. In collaboration with other European and US
efforts, the first phase of the project demonstrated the feasibility of developing,
deploying and operating a Grid-based computing system to meet the UK needs
of the Large Hadron Collider experiments. This note describes the work
undertaken to achieve this goal.
S Supplementary documentation is available from stacks.iop.org/JPhysG/32/N1.
References to sections S1, S2.1, etc are to sections within this online supplement.
(Some figures in this article are in colour only in the electronic version)
1. Introduction to Grid computing for particle physics
1.1. Particle physics computing
Particle physics has always been at the forefront of the development of scientific computing,
and with Tim Berners-Lee’s invention of the World Wide Web [1] at CERN, has influenced
all computing. We start with a brief examination of how particle physics computing has
developed over the last 20 years.
Twenty years ago particle physics computing was dominated by large mainframe
computers, typically manufactured by IBM, situated at a few key centres. These were
complemented by smaller institute-scale machines, such as the DEC-VAX range, used for
testing and smaller jobs. So great was the need to communicate with and between these
machines that particle physics became one of the first serious users of international networks.
The computing paradigm then (as now) was dominated by submission of prepared jobs in
batch mode, to run over large data sets stored close to the computing nodes, with typically a
few hours or days turn-around time.
Ten years ago, particle physics evolved to the use of modest clusters (∼50 nodes) of small
but powerful machines such as Sun, HP and IBM workstations. This led to the development of
sophisticated, often bespoke, software suites to manage job submission and data storage. Each
experiment would run its own clusters supported by in-house expertise. This model was quite
appropriate to the data rates and simulation requirements of experiments at electron–positron
colliders that were in full production at the time; for example, the ALEPH experiment had a
total raw data production of 3.5 TB [2]. At this time, networks were beginning to evolve to
higher capacities of 155–622 Mbit s–1. Particle physics moved to a predominantly Internet
Protocol-based model using the SuperJANET national education and research network, with
a few residual private links to CERN and the USA.
As new proton collider experiments began operating, data rates increased and the need for
more computing power arose. For example, the DØ experiment at Fermilab produced 30 TB
of raw data between 1992 and 1996 [2]. These higher data rates led to the transition to large
clusters of commodity computers (PCs) linked by cheap Ethernet. These ‘farms’ have now
become the norm, based upon the Linux operating system that is now the de facto standard
for scientific computing. Such clusters are run by large computer centres, such as the ATLAS
Centre located at CCLRC’s Rutherford Appleton Laboratory (RAL) in Oxfordshire. Facilities
have also been constructed at most university sites. The international networks had by now
grown to use 10 Gbit s–1 backbones which were (and still are today) more than adequate,
although this is expected to change as many end nodes become capable of generating data
rates greater than 1 Gbit s–1.
Thus, 5 years ago we had reached a model of reliance on commodity clusters of the
order of a few hundred nodes, backed by gigabytes of storage, and connected by national and
international networks based upon 10 Gbit s–1 backbones with 1 Gbit s–1 access links. During
this time, we have also seen the evolution of the programming norm from Fortran to C and
then to object oriented programming based upon C++ and sometimes Java.
However, the cluster computing model will not be sufficient to allow efficient analysis of
data from the next generation of particle physics experiments, and in particular CERN’s Large
Hadron Collider (LHC [3]) programme. In the following section we examine the computing
needs of the LHC and other current experiments, leading to an analysis of why Grid computing
has been chosen.
1.2. The LHC programme
To be able to search for new physics at the scale of 1 TeV requires the LHC, which is under
construction at CERN. The LHC will collide protons together at 40 MHz with a total centre
of mass energy of 14 TeV, making it the world’s highest energy particle physics accelerator.
The LHC will house four experiments, positioned around the ring at points where the
proton beams collide. Each high-energy proton–proton collision will generate hundreds of
particles that will shower out into the detectors to be recorded and analysed. When operating
at full intensity, around 20 such collisions will occur each time the beams cross, giving further
complexity.
Two of the detectors, ATLAS [4] and CMS [5], are general purpose, and will attempt to
explore the complete range of physics at the TeV scale. These will be the largest experiments
ever built with up to 108 readout channels. The LHC also provides a unique opportunity
for more specialized experiments. A third experiment, LHCb [6], will study the heavy
third generation b-quark, whose decays violate the combined symmetry of charge and parity
conjugation. Finally, the ALICE [7] experiment will focus primarily on collisions of heavy
ions, in order to study the creation of quark-gluon plasma.
1.2.1. The LHC computing challenge. The experiments carried out at the LHC will produce
more data than any previous coordinated scientific endeavour. Careful analysis of all of these
complex data will be required to achieve the full experimental sensitivity required in the
search for the Higgs boson, supersymmetry, CP violation and precision tests of the Standard
Model.
With the construction of LHC assured in the mid-1990s, attention turned to the off-line
computing problem. The Monarc project [8] was established in 1998 to create a blueprint
for cooperation between the many distributed computing centres. Then, in 2001 the Hoffman
review [9] established the scale of the required resources. This showed that the four major
experiments at the LHC collider would each generate petabytes of raw data per year, to be
processed into event summary data at CERN and then analysed by the worldwide community
of LHC physicists. This has since been updated to an estimate of 15 PB per year. At the time
of writing, it is projected that analysis of the data will require 100 000 CPUs (at 2004 levels
of processing power) [10].
The LHC experiments are therefore of a different scale and complexity to previous particle
physics experiments. The CDF and DØ experiments at Fermilab each accumulated tens of
TB of raw, reconstructed and analysed data during their first run. In comparison, the ATLAS
experiment will produce PB of data each year, requiring hundreds of times more CPU to
analyse than the first run of CDF or DØ.
A comparison of first level trigger event rates and sizes for several past, current and future
particle physics experiments is shown in figure 1. This illustrates the scale of the computing
requirements after initial filtering.
As discussed at the start of this note, data analysis for previous experiments took place
using central computing clusters. Although CPU and disk storage become cheaper each year,
there was insufficient funding available at the CERN centre to both build the LHC and meet its
computing requirements. Substantially more resources, both in terms of hardware, technical
support and funding, were distributed through CERN users’ home states. Therefore, despite
noting the superficially attractive option of concentrating all computing resources centrally at
CERN, the Hoffman review concluded that this would be impractical for a number of reasons,
including the following:
• it would rule out access to funding that would not be available at CERN;
• it would be difficult to exploit established computer expertise and infrastructure in national
laboratories and universities;
• the wish to devolve control over the computing resource.
However, this would require a solution for distributed data and CPU management. In
previous experiments, all file transfers had taken place by hand, with users needing to log in
directly to accounts at centres where they wished to run jobs or use data. Ad hoc solutions
for distributed worldwide Monte Carlo production had been developed by the experiments
(e.g. Funnel for ZEUS and Centipede for H1). However, the Monarc project found that
there had been few successes in distributed computing, with problems including support and
continuity at remote sites, maintaining and updating the same code at a number of sites and
hardware and operating system incompatibilities.
Figure 1. First level trigger event rates and sizes for particle physics experiments. The shaded
quadrant at the bottom-left corner covers the scale of data for which traditional computing models
were used. On this scale all the finally selected raw data can be stored on the site at which they
were produced and the computational analysis of the data could also be done on-site. Outside
the dotted line, the four LHC experiments either have large event sizes (ALICE), large event rates
(LHCb) or both (ATLAS and CMS) and are opting for a Grid solution for their off-line computing
requirements.
With data volumes increasing by at least two orders of magnitude, a more structured
approach would be required to make LHC data available to the 5000 physicists working on
the collaboration worldwide in 500 research institutions and universities. Data would need to
be distributed across the sites robustly (each file must be replicated on more than one site);
efficiently (files should be stored close to where they are needed most often) and transparently
(end users should not need to be concerned with where the data are stored or how). It would
also need to be ‘persistent’—available for the whole 15 years of the LHC project.
It was therefore decided to use a distributed, hierarchical model, based around the new
technology of Grid computing. The Grid aims to integrate the computing power of sites
worldwide, allowing a user to submit a computing job from anywhere in the world, for that
job to run at a site somewhere else in the world on data that are not local to the user and for
the results to be returned. A Grid for the LHC would:
• incorporate regional and local computing resources into the worldwide computing effort.
This has the advantage of allowing individual institutes and national centres to maintain
and upgrade these resources;
• make efficient use of CPU worldwide by automatically balancing the computing load
across available resources;
• allow users to run their Grid jobs and obtain access to their data without the need to
apply in advance for computer accounts at every single Grid site and log on to the sites
manually;
• store copies of data in regional centres. This is a more effective use of limited network
bandwidth than copying them from CERN every time they are needed. Such a scheme
would therefore balance proximity of the data to centralized processing resources with
proximity of users to frequently accessed data;
• allow the effective involvement of scientists and students in each region, and utilize
computing expertise from regional computing institutes, without the need for them to
work physically at CERN;
• have no single points of failure, as there are multiple copies of data and computing jobs
are assigned to available resources;
• cover all time zones, enabling easier provision of 24 h support.
Figure 2 shows the agreed model for LHC data processing. Data leave the detectors at
∼1 PB s–1, but this is reduced to a few hundred MB s–1 by the online trigger system and this
is recorded to mass storage. The resulting data sets will be a few PB of raw data per year per
experiment, or roughly 15 PB per year overall.
It is expected that copies of all of the raw data will be transferred to a set of Tier-1 sites at
major national computing centres. Data reduction will then be performed both at CERN (Tier-
0) and the Tier-1 sites. In this way, data sets needed by physicists will be spread throughout the
world in multiple copies for resilience. Smaller Tier-2 sites (typically universities or groups
of universities) will also take responsibility for analysis and simulated data production. The
overall model therefore will lead to a mesh of data flows and processing steps spread over
geographically distributed centres. The estimated load on the networks will be some tens of
Gbit s–1.
However, Grid computing for the LHC poses a number of challenges, including deciding
where computing jobs are run; who should have access to the data and computing resources;
how access will be controlled; ensuring sufficient levels of network bandwidth; deploying
software and updates across many different locations; managing data over long periods of
time and providing fast and secure access to that data. In addition, software for analysis
needs to be developed that can use the Grid’s resources, and interfaces built to allow particle
physicists to submit their jobs to the Grid. In the next sections we introduce Grid computing,
the GridPP and LCG projects, and then consider how a particle physics Grid works in practice.
1.3. Grid computing
In its most general sense, Grid computing is the collaborative use of computing resources in
multiple administrative domains. The resources in question may be computers themselves,
data storage systems, computer networking or more sophisticated facilities such as electron
microscopes, telescopes and even particle accelerators. Coordination across institutions
may be required either because of the uniqueness of some resources; to facilitate
collaboration between teams of experts from several groups or to aggregate resources to
tackle large-scale problems beyond the scope of individual institutions. The data processing
and analysis challenges posed by the experiments at the LHC have all three of these
requirements.
In 1964, Martin Greenberger wrote an article for The Atlantic Monthly entitled ‘The
computers of tomorrow’ [11], in which he proposed that computing development would
follow the same lines as the development of electricity, evolving into a utility that people could
use for any kind of computational problem. The electrical power Grid provides a reliable,
constant source of power that any machine designed with the appropriate wiring can plug into
and use, irrespective of which power plant generated the power. Similarly, the computational
Grid was foreseen to be a utility of processing power providing standard interfaces to which
Figure 2. The LHC tiered computing model. Raw data are handled at the CERN Tier-0 centre.
Both raw and processed data are then shipped to Tier-1 centres around the world. Each Tier-1 has
a number of related Tier-2 centres: in the UK these are regional groups of Tier-3 institutes, such
as universities or research centres. Processing power and storage are that estimated to be in place
when the first LHC data are analysed. Storage is disk only. 1kSI2k = 3 GHz CPU.
any computer can link to harness its power, with the source of the power completely transparent
to the user.
Grid computing gained much wider visibility in 1999 following the publication of The
Grid: Blueprint for a New Computing Infrastructure by Foster and Kesselman [12]. This
influential book painted a broad vision for Grid computing and the opportunities it presented
across a range of scientific and industrial applications. We also saw the emergence of the
Global Grid Forum, now a standards-defining body that is essential to focus effort and
allow national projects to integrate with worldwide partners. Thirdly, the UK established an
e-Science programme, described in section 1.7.4. The GridPP project, the UK’s contribution
to computing requirements for the LHC, is part of this e-Science programme.
1.4. The GridPP project
GridPP, the UK Grid for particle physics, is developing the computing tools and infrastructure
to allow particle physicists to collaborate effectively when LHC data taking begins in 2007.
The 6-year, £33m project began in 2001 and has been working in three main areas:
• developing applications to allow users to submit data to the Grid for analysis;
• writing middleware to distribute jobs around a secure Grid;
• deploying computing infrastructure at sites across the UK.
A key component in this development was, and continues to be, the use of new tools and
techniques within current experiments. In this way the current experiments quickly benefit
from new developments, which are tested in real production use.
The UK particle physics Grid currently contains some 3000 CPUs, and has approximately
1 PB of storage available for the experiments.
GridPP is now in its second phase (GridPP2). Between now and 2007, the lessons learned
will be used to improve the deployed systems so that they can be scaled to the levels required
for the LHC. The infrastructure deployed in the UK will be tested continuously, both by current
experiments and by the LHC Data Challenges to ensure that the final system is ready for the
first LHC data.
1.4.1. The LHC computing Grid (LCG). In 2002, CERN established the LHC Computing
Grid Project [13], to deploy Grid computing solutions at computing centres that have signed
up to deliver computing resources for the LHC experiments. Existence of the necessary
middleware is not in itself enough to solve the LHC computing challenge. Experiments also
need software that is able to exploit the Grid infrastructure and guaranteed access to sufficient
computing resources. Overall, the GridPP contribution represented almost 40% of the non-
CERN resources allocated to the project and roughly 25 staff members funded via GridPP
were active in the project’s key areas.
At the time of writing, the LCG had more than 10 000 CPU and more than 7 PB of storage
capacity on disk and tape, at over 100 sites in 31 countries. This is approximately 5% of the
processing capacity required for the LHC in the long term.
1.5. How the particle physics Grid works
A Grid infrastructure is in general built from an aggregation of many different hardware
platforms running different operating systems and managed by different administrations. At
the same time the Grid must appear to the user application with a uniform interface from the
point of view of submitting and retrieving work, such that the user does not have to have a
specific knowledge of, or relation to, the resources. This is the function of middleware—to
provide a uniform access layer of services, which buffer the user from the details of the
underlying resources.
GridPP uses middleware developed as part of the European DataGrid (EDG, see section
1.7.2) project. In association with CERN’s LGC Project we have tested and hardened these
and other components from the Virtual Data Toolkit [16]. Middleware development continues
as part of the Enabling Grids for e-Science in Europe project (EGEE, see section 1.7.3).
Consider a practical example: a physicist in Sheffield University has prepared an analysis
program to sort through a large data set which has been recorded by an LHC experiment. The
physicist sends this into the Grid, whence a suitable computing resource must be located upon
which to run the job—let us say that this is available in Karlsruhe. The data set required as
input resides upon a big disk farm in the RAL in Oxfordshire. This data set must be identified
as part of executing the job, and then copied to Karlsruhe prior to execution. When the job is
finished the original user must be informed and the results sent back.
This process may sound simple, but now we are going to walk through the components
needed to allow this to all happen in a ‘Grid like’ way. The Grid aggregates resources that
may be added or removed at any time—so there is no sense in which the user can either know
of the resource they might use, nor be known personally by the resource provider or have a
classical ‘account’ upon such a resource.
• The user prepares a job. This needs a user interface, to help the user prepare the job,
submit it, monitor it and retrieve the results. The user interface can be the experiment
computing framework, or it might be a web portal or command line interface. Section S1
(in the online supplementary documentation) examines the applications that particle
physics experiments have developed to allow data analysis and simulation on the Grid.
• For simplicity, let us assume that the job is an executable binary, plus some specification
of input and output files. We said that the user must send this to the Grid. What does this
mean in practice? Let us imagine that the user has an access portal (a simple graphical
user interface (GUI) which will take the job specification and do the right thing with it).
To take this first step there must then be a service somewhere on the Internet, known by
the GUI, to which the job specification can be sent, and which will be able to locate a
‘Grid resource’ somewhere around the globe upon which the user has the right to run the
job. This is known variously as a resource broker, or workload manager (WM), and is
considered in section S2.1. We can already see that since in any scalable system there must
be the possibility of several such WMs, possibly provided by third parties, there must be
some form of standardized job submission interface and description language—we will
see this theme of standard protocols and interfaces pervading Grid middleware.
• The first thing the WM will do upon receipt of the job is to check the identity and
rights of the user. This leads immediately to the need for security services based upon
digital credentials, which can prove identity, confirm that the user belongs to a particular
experiment (or virtual organization—VO) and perhaps confirm their role within that VO.
These security services must be accessible by many of the Grid components. Security is
examined in section S2.6.
• Once the WM has performed authentication and authorization checks, then it must locate
suitable resources. It can only do this if there is a publication and discovery system to
advertise resource availability. This leads to the need for monitoring and information
systems, considered in section S2.3. These must also allow the WM to verify that the
user has the rights to use any resource it finds.
• Once a computing resource is found, then the job must be sent to it. This implies the
need for a standardized job submission interface sitting on top of whatever actual job
submission system runs locally. In addition a status logging system is required so that the
user can query the progress of the job and retrieve results. These components were built
on top of the Globus toolkit and Condor (see section 1.7.1).
• At some point the job will run. It will immediately need to open the input file, which is of
course stored remotely. The user’s programme will also most likely refer to some logical
identifier (such as ‘the high transverse momentum lepton sample’) rather than a physical
identifier. This leads to the need for a data replica management service, which manages
and keeps track of logical to physical file mappings, as well as actual physical file replica
locations. Data management is examined in section S2.2.
• Once the physical files are identified, they will need to be pulled from the remote storage.
This also requires a standardized way of accessing and transporting data from storage
elements that comprise of mixtures of disk and mass storage archives. Section S2.5 looks
at Grid storage.
• In order to ensure that data can be transported in a reasonable time, or even to select the
best physical data set location, the data management services must be able to query the
status of network connections in the same way as for CPU and storage availability. This
information is also required as part of the operational monitoring infrastructure. Networks
and monitoring are considered in section S2.7.
• When the job finishes, the output file must be sent back to the user. The user will not in
general be ‘online’ and nor will there necessarily be an Internet connection to the user’s
site. This relies on the logging and bookkeeping services described as part of workload
management.
1.6. Computing for non-LHC experiments
Although the move towards the Grid was predicated upon the requirements of the LHC
experiments, nevertheless some of the existing experiment programmes are also able to benefit
from the transition to Grid technology. In the USA, the Particle Physics DataGrid has reported
a 20–50% gain in resources for experiments through job scheduling over the Grid, from the
use of opportunistic and distributed resources.
These non-LHC experiments differ widely, not only in the physics they address and the
detectors and accelerators they use, but also in their computing models and their timescales.
There are four such experiments that played a major part in GridPP1, the first phase of the
Grid PP project.
1.6.1. BaBar. The BaBar experiment situated at the Stanford Linear Accelerator Centre
(SLAC) is studying the phenomenon of CP violation through the decay of B mesons. BaBar
initially started with a central computing model. With the increasingly successful operation of
the PEP-II accelerator, producing billions of B mesons, it became clear that a new distributed
strategy, involving the use of large ‘Tier A’ sites at RAL and other national centres, was
necessary. In 2004, BaBar produced over 2 billion Monte Carlo events, with 30 sites in six
different countries using its legacy system for event production. The experiment plans to
use Grid resources to triple this rate, to keep up with the ever increasing performance of the
Stanford Linear Accelerator. Section S1.3.1 gives more detail on BaBar’s use of the Grid.
1.6.2. CDF and DØ. The UK is involved in two experiments at the Tevatron at Fermilab
(FNAL): CDF and DØ. These measure proton–antiproton collisions which are similar to those
of the LHC but at lower energy (2 TeV in the centre of mass). These experiments have been
running for many years, but are currently undertaking a new data taking period (Run II) with
a large increase in luminosity and data processing requirements. The previous computing
model had been centralized; however, the data processing requirements for Run II outstrip
the capability of the FNAL system, including any imaginable upgrades to it. The DØ SAM
system (sequential access to data via metadata) has been adapted to Grid technology, and is
now used by both DØ and CDF. DØ has reported that using Grid protocols to transfer data has
resulted in increased throughput by a factor of 5. They were also able to reprocess 100 million
events remotely, to meet an otherwise impossible publication deadline. CDF aim to have 50%
of the experiment’s computing outside Fermilab by the end of 2005. Use of the Grid by CDF
and DØ is examined further in section S1.3.2.
1.6.3. UKQCD. The UKQCD Collaboration is concerned with lattice calculations in respect
of quantum chromodynamics (QCD). Lattice QCD, as it is called, is performed by dividing
spacetime into a discrete lattice (in four dimensions) and then performing parallel calculations
at the nodes and on the links. To do this requires very large and leading-edge parallel computing
facilities and this work shares many features with particle physics experiments. Large data
sets produced on the lattice must be stored and replicated using distributed Grid technology.
These data, which are in effect the raw ‘experimental’ data, must then be processed repeatedly
by remote collaborators for different investigations. This user processing step is performed on
conventional architectures and is amenable to the use of distributed Grid resources. Section
S1.4.1 considers QCDGrid.
1.6.4. Other. For completeness we mention the other experiments in which the UK is
involved. Some have been running for many years and have evolved a computing model
which works for their limited data rates. Others are newly emerging and will be able to
embrace a Grid approach from the start.
In the first category lie the LEP and HERA experiments. These use systems whereby the
data processing and data storage are essentially all done at the host accelerator site (CERN
and DESY respectively). The LEP experiments (the UK is involved in ALEPH, DELPHI and
OPAL) have completed data taking, and their analyses continue within a system that works and
with nothing to gain from modernization. The HERA experiments are now entering phase 2
running and while data taking continues, the computing resources are under increasing strain,
and there is a motivation to adopt new techniques.
The second category of newly emerging experiments includes the linear collider groups
(CALICE, LC-FI and LC-ABD), the neutrino factory studies and the pre-cursor MICE
experiment, dark matter searches and the neutrino experiments MINOS and ANTARES. These
are generally at the stage of a few dedicated users running a small number of simulations, and
are not yet at the stage of designing the overall computing system. When one of these matures
it will be integrated into the GridPP project; however, this did not arise during GridPP1.
1.7. Grid projects
Having set the scene, we now conclude this introduction with a brief description of relevant
Grid projects, which set the context for GridPP and the rest of the note.
1.7.1. Middleware projects. The middleware used by GridPP builds on that from the
Globus and Condor projects. The Globus project [14] is focused on enabling the application
of Grid concepts to scientific and engineering computing. In particular, it provides the
Globus toolkit, which includes software services and libraries for monitoring, discovering
and managing resources on the Grid, plus security and file management. Condor [15] is a
specialized workload management system for compute-intensive jobs. Users submit their
serial or parallel jobs to Condor, Condor places them into a queue, chooses when and where
to run the jobs based upon a policy, monitors their progress and ultimately informs the user
upon completion. Condor and Globus components are packaged and tested as part of the
Virtual Data Toolkit (VDT [16]) which is then used to provide components of the LCG/EGEE
middleware deployed by GridPP.
1.7.2. The European DataGrid (EDG). In January 2001, the European DataGrid [17] was
founded as the flagship European project to develop a prototype Grid service. The EDG was
funded by the European Union and involved six major partners including the UK.
The EDG project served three distinct application areas: (i) particle physics (ii) Earth
observation and (iii) bio-medical imaging. Significant effort was devoted to working with
these applications to Grid-enable their software. The project was successfully completed in
March 2004.
EDG developed the higher level middleware, on top of existing middleware, necessary
to build a Grid that could be used by several distributed communities (see section 1.5 for a
description of how the middleware works). The middleware developed by EDG included the
following.
• Workload management and logging services: to accept user requests, match them to
resources around the globe, and to track and report progress.
• Storage and data management: required to access heterogeneous storage systems and to
manage data replicas thereon.
• Resource information services: required to provide the much richer information set
representing ‘computing’, ‘storage’ and ‘network’ elements needed by the workload
management system.
• Installation and configuration: required to manage distribution of software and
configuration of computing nodes.
• Virtual Organisation (VO) management: to allow resource providers to verify the identity
and capability of people belonging to large distributed communities. This was a key
development without which a scalable Grid, serving many and varied users, could not be
constructed.
• Network performance monitoring: to provide connectivity, bandwidth and stability data
to the information services.
1.7.3. Enabling Grids for E-sciencE (EGEE). The EGEE project [18] is a successor to the
EDG project, but aiming to deploy a production Grid for use by e-Science. EGEE is funded
under the EU framework VI infrastructure funds programme.
In practice EGEE builds strongly upon the previous EDG (and therefore GridPP1) and
LCG software stacks, as well as components from several US projects. EGEE is funded at the
level of€32m for 2 years starting in April 2004. GridPP is a key component of EGEE through
its relation with the UK Tier-1 centre situated at the RAL, as well as many other groups
who work within specific EGEE activities. GridPP will work closely with EGEE and the
UK National Grid Service (NGS, see below) to deploy a consistent production infrastructure.
More details about EGEE are given in section 3.3.
1.7.4. The UK e-Science programme. The 5-year UK e-Science programme (2001–2006)
was established by the then Director General of the UK Research Councils, Dr John Taylor. It
is a common programme across all UK research councils to develop the advanced collaborative
computing required by today’s scientific researchers. Over the full 5 years the UK will invest
approximately £250m in a wide range of technological developments covering advanced video
conferencing, visualization, data storage, high throughput and high performance computing
and computer networking and security. A key component is the engagement of industrial
partners, coordinated through a cross discipline ‘Core Programme’ focused on identifying
common themes.
The pivotal role of the challenges facing the LHC was recognized at an early stage,
and the particle physics community was already collaborating in establishing the EU-funded
DataGrid (EDG) project. The Particle Physics and Astronomy Research Council was given
a sizable allocation of the e-Science investment with which it established two major projects:
GridPP and the Grid for Astronomy (AstroGrid). In addition, as part of the process of
modernizing university infrastructure, significant computing resources were installed by the
Higher Education Funding Council for England (HEFCE) and the Scottish Higher Education
Funding Council (SHEFC) through initiatives such as the Science Research Investment Fund
(SRIF).
1.7.5. The UK National Grid Service (NGS). The UK’s National Grid Service [19] began
in April 2004 and is the first step towards deploying and operating a Grid infrastructure to
support all UK researchers. The NGS builds on the experiences of GridPP and other projects
to provide Grid-enabled access to computer clusters, data archives, advanced software and the
UK’s high performance computing facilities. In addition to a set of core resources, the NGS
serves as a means of resource sharing across UK academic institutions. The central services
for the NGS are coordinated and supported by the Grid Operations Support Centre (GOSC),
providing services such as the UK Certificate Authority (CA) and a central helpdesk.
At present the NGS and GridPP resources only partially overlap. However, the CA,
helpdesk and operational monitoring are common efforts across both projects. This integration
is expected to grow in future as the underlying Grid technologies become more coherent,
allowing common services to support more disciplines, and as more GridPP institutions
expand Grid support to cover a wider range of research areas. In the latter case, for example,
rather than joining GridPP and the NGS, an institution would simply become an NGS partner
supporting GridPP as well as a range of other projects.
1.8. Summary
In this introduction the concept of, and motivations for, Grid computing have been outlined.
Grid computing aims to provide a new paradigm of computation for science. The particular
need for Grid computing for the LHC experiments at CERN comes from the unprecedented
scale of data they will produce. Current and future particle physics experiments will use the
same shared infrastructure. Only by distributing the computational load globally can physicists
cope with the requirements of the experiments. In order to meet these requirements, we
envisage more than 100 000 computers worldwide of which 10 000 will be in the UK by 2007
operating as a Grid production service.
We envisage Grid computing will do for access to distributed computing what the World
Wide Web did for access to stored information: that is, provide the layer of uniformity and
transparency to allow use of resources without the users needing to have an explicit relationship
with the provider, or even care who or where the provider is. If this model pervades commerce
and society in the future, then the developments made in the GridPP project described in this
note will have played a significant role in this evolution.
2. Summary of developments during GridPP1
2.1. Physics motivation
Due to the enormously high energy, high luminosity and complexity of the detectors, the LHC
experiments will produce unprecedented amounts of data, estimated to be more than 15 PB
per year, for off-line analysis by teams of physicists all over the world. To analyse these
data and to generate the Monte Carlo simulated data necessary to understand it will require
huge amounts of computing and data storage facilities. These computing resources will be
distributed across the world, linked together as a ‘Grid’.
GridPP has built a prototype Grid in the UK that enables the LHC experiments to generate
large amounts of Monte Carlo simulated data. This is being tested by current experiments in
the USA with which the UK is involved: BaBar at SLAC and CDF and DØ at the Tevatron,
FNAL. Several other smaller experiments have also started to use the prototype Grid. Having
these non-LHC experiments involved in the development of the Grid has been enormously
helpful, since these physicists are performing real physics analysis. This places quite different
demands on the robustness and stability required of the systems, compared to simulation or
testing.
Although GridPP has focused on the provision of computing resources for the LHC
experiments and associated phenomenologists, the project continues to support the US-based
and other experiments such as H1, ZEUS, UKDMC and groups preparing for new initiatives
such as MICE and the Linear Collider. By 2007, it is expected that nearly all UK particle
physics computing equipment will be part of the Grid and hence we have to ensure that every
UK experiment can use the Grid for their analyses even though the resources they require will
only be a small fraction of the total.
2.2. LHC computing Grid (LCG)
GridPP funding was instrumental in establishing the LCG project at CERN, which is a Grid
deployment project organized internally in four areas: applications, fabric, technology and
deployment. The applications area is currently consolidating a number of software projects
that are common across the LHC experiments, such as POOL, the common persistency
framework and the Physicist Interface project that is now moving to ARDA (Architectural
Roadmap towards Distributed Analysis). The fabrics area is charged with constructing the
Tier-0/1 centre at CERN where the LHC data will be reconstructed and significant progress
has been made in the development of fabric management tools as well as progressive upgrade
of resources. In the Grid technology and deployment areas, the first release of LCG software,
LCG-1, based on the EDG middleware and elements of the US Virtual Data Toolkit was
deployed to 28 sites worldwide by the end of 2003 and the second release LCG-2 has been
rolled out to more than 100 sites worldwide.
2.3. Middleware and applications
GridPP was a major investor in the EDG middleware development project that ended in March
2004 and provided the leader or deputy leader in five of the eight relevant work packages.
GridPP’s main contributions were the releases of a number of middleware/software packages.
R-GMA, the Relational Grid Monitoring Architecture, provides information about the Grid
to brokers and users. OptorSim simulates the EDG architecture and allows optimal file
replication strategies to be developed. Spitfire allows secure access to metadata catalogues
while the storage element provides transparent access to mass storage systems. GridSite
allows remote management of web sites using Grid certificates.
In application development, one of the successes of GridPP1 has been the GANGA project,
a joint ATLAS–LHCb initiative to provide a user–Grid interface allowing configuration,
submission, monitoring, bookkeeping, output collection and reporting of Grid jobs. GANGA
is likely to be adopted by other experiments in the future. Other major developments have
been the DIRAC LHCb interface to POOL, AtCom, the ATLAS Commander Monte Carlo
production tool and the use of R-GMA to monitor CMS applications. All LHC experiments
have been involved in increasingly large ‘Data Challenges’, which test applications developed
for the Grid. In addition to the LHC experiments, GridPP has helped develop SAM, originally
from the US DØ experiment, into a very successful joint CDF/DØ SAMGrid that is deployed
at many sites worldwide to schedule data transfers from a central repository for local analysis.
The other US experiment, BaBar, has developed a remote submission system that allows users
to locate data and run analysis jobs at several UK sites. Finally, the UKQCD Collaboration
has successfully produced an operational Grid for distributed processing of lattice QCD data
spread across seven nodes at four sites.
2.4. Planning and deployment
GridPP has constructed a prototype LHC Tier-1 regional centre at RAL that also serves as a
BaBar Tier-A centre. As of November 2004, the total resources comprised ∼700 Intel CPUs
(450 MHz–2.6 GHz), ∼80 TB of available disk space and ∼60 TB of tape, with a theoretical
tape capacity up to 1 PB. Not all of the resources were available via the Grid but that will ramp
up over GridPP2. In addition to the Tier-1, GridPP is developing four regional Tier-2 centres,
to harness the massive resources at the universities provided through the Joint Infrastructure
Fund/Joint Research Equipment Initiative and SRIF.
3. Outlook
3.1. GridPP2
The initial 3-year phase of the project, GridPP1—‘From Web to Grid’, successfully established
a prototype Grid in the UK as described above. The project has been extended for a further 3
years to September 2007 as GridPP2—‘From Prototype to Production’. This will build upon
the achievements of GridPP1 and turn the prototype Grid into a production Grid of sufficient
size, functionality and robustness to be ready for the first data from the LHC, due at the end
of 2007. The GridPP2 project has been allocated £15.9m by PPARC with a further £1m set
aside as a possible additional contribution to LCG during this period.
3.1.1. Middleware and applications. In GridPP2, similar areas of middleware activity will
be supported as in GridPP1, but the emphasis will change from development to deployment
of a full-scale production Grid. In GridPP1 several middleware development projects were
undertaken, under the auspices of the EDG project. In GridPP2 these have been consolidated
to concentrate on the areas that are of primary importance to UK physicists, such as Grid
data management (metadata handling) and storage interfaces. GridPP2 will also focus on
areas where the UK has particular expertise and played a leading role in EDG such as
workload management, security, information services (R-GMA) and networking. This future
development work will take place as part of the EGEE project (see below).
Applications development in GridPP2 will continue with support for the LHC experiments
ATLAS, CMS and LHCb and the joint ATLAS–LHCb GANGA project. US experiments will
also be supported: BaBar, and CDF and DØ through SAMGrid. In addition to existing support
for lattice QCD theory (QCDGrid) there will be support for particle phenomenology, an area
crucial to the success of LHC physics, through PhenoGrid. GridPP will also develop a generic
‘portal’ that will allow other experiments, not directly supported by GridPP, to access the UK
Grid and its computing resources.
3.1.2. Deployment and operations. A very important component of GridPP2 will be the
deployment team led by a newly appointed Production Manager. This team will consist of
middleware experts and technical coordinators from the Tier centres who will be responsible
for the deployment and operation of the production Grid. This will include development of the
individual resources; the technical and organizational integration of the parts and the roll-out
of an operational Grid service to, eventually, a level of stability and an ease of use consistent
with a production facility.
Initial models of LHC computing involved a hierarchical arrangement of tiered regional
centres, starting from Tier-0 at CERN, to major Tier-1 centres in several countries, then to
smaller Tier-2s and Tier-3s in institutes and departments. This model is being modified and
the hierarchical nature becoming less distinct with the concept of virtual regional centres
emerging. However, the realities of bandwidth, data and service hierarchies still motivate a
multi-tiered approach and so the terms Tier-1, Tier-2, etc are retained.
In GridPP1, there was no specific funding for Tier-2s as the emphasis was on the
development of the prototype Tier-1 Centre which provided sufficient resources during the
first phase of the project. However, in future the Tier-1 Centre will not be able to provide
all the resources required by the experiments. GridPP is therefore developing four regional
Tier-2s in:
• Northern England (NorthGrid: the Universities of Lancaster, Liverpool, Manchester and
Sheffield, and the Daresbury Laboratory);
• Southern England (SouthGrid: the Universities of Birmingham, Bristol, Cambridge and
Oxford, and the Rutherford Appleton Laboratory);
• Scotland (ScotGrid: the Universities of Edinburgh, Glasgow and Durham) and
• London (Brunel University, Imperial College London, Queen Mary University of London,
Royal Holloway, University College London).
These will logically group together resources provided by the institutes in those regions.
It is expected that the total resources at the Tier-2s will be about the same as at the Tier-1
Centre.
Technically, there may be little distinction between a single resource at a Tier-2 or
elsewhere, but overall different centres will be better suited to different tasks. In terms of
the envisaged distributed data caching of Event Summary Data, Analysis Object Data and
TAG event identification data it is clear that this more refined data should be as close as
possible to the physicists performing their analysis. TAG data will reside primarily on the
Tier-3 resources, such as local workstations, and the required streams of ESD and/or AOD
data will reside at the Tier-2s. These centres are already very important politically, financially
and sociologically in providing ‘local’ resources and experience and providing a focus for
leverage of external funds.
GridPP will be providing funds for hardware and manpower at the Tier-1 Centre and
manpower support for the Tier-2s. GridPP will also provide a small amount of hardware so
that each institute will have a common set of front-end interfaces to the Grid. However, it is
expected that the bulk of the Tier-2 hardware will continue to be provided by HEFCE through
initiatives such as SRIF.
In addition, there will be continued support for travel to meetings, conferences and
workshops and support for management positions. GridPP2 also includes the appointment
of a full time Dissemination Officer to manage the GridPP web site, run events, produce
literature, liase with the press and work with other disciplines.
3.2. CERN LCG
Five years after it first appeared, offering a way to integrate widely distributed computing
resources for the LHC, Grid computing is still in a state of flux. Changes to the Globus
architecture and the many projects working to develop Grid middleware support an argument
that there is, as yet, no ‘Grid computing’ solution.
However, the past 4 years have seen significant progress towards the integration and
alignment of widely distributed particle physics computing resources that have long been
recognized as essential for effective exploitation of the LHC data. At the time of writing, the
LCG2 service brings together over 10 000 CPUs at more than 100 sites in over 30 countries to
provide a computing resource accessible to the LHC Data Challenges from a central resource
broker. In addition to the CPU capacity, nearly 10 PB of storage is available and there is a
Replica Location Service (RLS) in place to maintain a consistent list of accessible files.
The LCG2 service was used by CMS in March–April 2004 for their data challenge
[20] designed to test the full chain of LHC data processing from event reconstruction at
the CERN Tier-0 to analysis at a remote Tier-1 centre [21]. While there are areas of the
service that can be improved, the Hoffmann review stressed the need for services to ‘evolve
under the strain of real users attempting to get their work done’ and we confidently expect
the LCG2 service to improve as problems identified by the experiment Data Challenges are
addressed.
Looking more widely, worldwide computing needs a worldwide support and operations
infrastructure. Here again, the past 4 years have seen significant steps towards meeting the
needs of 2007. The LCG project has established a Grid Operations Centre (see section S3.4)
at RAL and also a Grid User Support Centre at the GridKa centre in Karlsruhe, Germany.
More recently, Taiwan’s Academica Sinica Computing Centre has established similar centres
in an Eastern time zone as the next stage in development of a worldwide, round-the-clock
service.
Seen from CERN, then, the situation now is that the LCG project, by setting up an initial
production Grid service, has put in place the foundations of the overall Grid environment that
will be required when LHC begins operations in 2007. With these foundations laid, we are
well placed to exploit the expected developments and improvements in Grid middleware and
other software components over the next 2 years.
3.3. Enabling Grids for e-Science
As introduced briefly in section 1.7.3, EGEE is a 2-year project as part of a 4-year programme,
which aims to integrate national, regional and thematic Grids to create a European Grid
infrastructure. It is part sponsored by the EU and part by national resources. Where the
EDG project led in prototyping Grid systems through R&D and in integrating with other
technologies (e.g. Globus and Condor), EGEE now takes over in moving from prototypes to
delivery of production quality Grid services for the European academic community. GridPP,
along with co-workers in the UK e-Science programme are major contributors to the EGEE
project.
EGEE encompasses over 70 partners from 27 countries organized into 12 regional or
functional federations:
• CERN
• Central Europe including Austria, Czech Republic, Hungary, Poland, Slovakia and
Slovenia
• France
• Germany and Switzerland
• Ireland and the United Kingdom
• Italy
Figure 3. Schematic evolution of application communities benefiting from EGEE infrastructure
(Ack. the EGEE Consortium).
• Northern Europe including Belgium, Denmark, Finland, The Netherlands, Norway and
Sweden
• Russia
• South-East Europe including Bulgaria, Cyprus, Greece, Israel and Romania
• South-West Europe including Portugal and Spain
• NRENS (National Research and Education Networks)
• United States
The project is structured into the following activities (where the terms in parentheses refer
to EGEE formal activity groups):
• Grid operations, support and management (SA1). This is the largest (by funding and
people) activity, dealing with production software releases and support, and a distributed
operational model to bind national Grid centres into a coherent framework.
• The interface between EGEE and the European networks (SA2), comprising Ge´ant and
national education and research networks such as SuperJANET.
• Joint research activities to cover development of middleware to enhance the production
infrastructure (JRA1, 2, 3, 4).
• Application support to help applications use EGEE (NA4).
• People networking to cover management, dissemination, training and international
cooperation (NA1, 2, 3, 5).
A Grid Operations Centre provides both real-time monitoring of Grid status and archives
of Grid usage.
The operational infrastructure is backed up in two key ways. Firstly, there is an extensive
middleware development programme focused on engineering and integrating production
quality Grid services. This is based on prototypes from previous R&D projects (e.g. EDG),
core software from other projects and new software. A major aim of this activity is to
move to web service-based middleware. Secondly, a strong emphasis is placed on training,
dissemination and outreach. A substantial set of training modules is being developed and
delivered and a particular activity to develop new application communities that will use the
infrastructure is underway. An Industry Forum provides links to the commercial world and a
number of relationships with related projects have been developed.
With resources derived from a large number of domains and funding sources there exist a
variety of approaches. In order to harmonize contributions into a coherent whole while at the
same time respecting local ways of working, EGEE also convenes a high-level group working
on policies and best practice and involves a cross section of the wider Grid community in
Europe.
As a starting point the initial applications exploiting EGEE are based on high-energy
physics and bio-medical communities. The initial starting point for production services is
based on the second release of the LHC computing Grid infrastructure. However, it is a major
deliverable of the project to expand the portfolio of disciplines benefiting from EGEE, as
exemplified in figure 3.
4. Conclusion
At the conclusion of the first half of the GridPP project, now is an appropriate time to ask:
‘Has GridPP built a real Grid?’ Ian Foster devised a three-point checklist for defining a Grid
[22]: ‘A Grid is a system that (1) coordinates resources that are not subject to centralized
control. (2) . . . using standard, open, general-purpose protocols and interfaces. (3) . . . to
deliver nontrivial qualities of service.’
The first of these is clearly met since the resources are owned and controlled by the
participating institutes and not by CERN or GridPP. The second is certainly met by most of the
middleware components coming from the Virtual Data Toolkit (Globus, Condor-G, etc) and
from EDG/EGEE which are both open source projects. The third is perhaps more subjective
but the experiments have certainly conducted non-trivial Data Challenges over the Grid.
CMS generated 75M events comprising 150 TB of data, ATLAS generated 7.7M events and
22 TB of data, while LHCb generated 186M events, for which over a quarter of the CPU was
in the UK.
In conclusion, during the prototype stage, GridPP has demonstrated that the Grid
computing paradigm works and has built a Grid of considerable size and complexity that
is being routinely used by the experiments to generate significant amounts of simulated data.
The challenge for the next 3 years is to expand the prototype Grid to full size with the necessary
robustness and security in order to be ready for the first data from the LHC, so that the full
physics potential of this exciting new accelerator can be realized.
References
[1] Berners-Lee T and Fischetti M 1997 Weaving the Web (San Francisco, CA: Harper)
[2] MONARC Site and Network Architecture Working Group 1999 MONARC Report on Existing Computing
Architectures
[3] LHC Study Group 1995 The Large Hadron Collider Conceptual Design CERN/AC/95-05
[4] ATLAS Collaboration 1994 ATLAS Technical Proposal CERN/LHCC/94-43
[5] CMS Collaboration 1994 CMS Technical Proposal CERN/LHCC/94-38
[6] LHCb Collaboration 1998 LHCb Technical Proposal CERN/LHCC/98-4
[7] ALICE Collaboration 1995 ALICE Technical Proposal CERN/LHCC/95-71
[8] Campanella M and Perini L 1998 The analysis model and the optimization of geographical distribution of
computing resources: a strong connection MONARC Note 1/98
[9] Bethke S, Calvetti M, Hoffmann H F, Jacobs D, Kasemann D and Linglin D 2001 Report of the Steering Group
of the LHC Computing Review CERN/LHCC/2001-004
[10] LHC Collaboration 2005 LHC Computing Grid Technical Design Report CERN/LHCC/2005-024
[11] Greenberger M 1964 The computers of tomorrow Atlantic Monthly May
[12] Foster I and Kesselman C 1999 The Grid: Blueprint for a New Computing Infrastructure (San Francisco, CA:
Morgan Kaufmann)
[13] CERN Council 2001 Proposal for Building the LHC Computing Environment at CERN CERN/2379/Rev
[14] Foster I and Kesselman C 1997 Int. J. Supercomput. Appl. 11 115–128
[15] Tannenbaum T, Wright D, Miller K and Livny M 2001 Condor: a distributed job scheduler Beowulf Cluster
Computing with Linux ed T Sterling (Cambridge, MA: MIT Press)
[16] http://www.cs.wisc.edu/vdt
[17] Burke S et al 2004 HEP applications experience with the European DataGrid Middleware and testbed Proc of
CHEP2004 (Interlaken, Switzerland, 27 September–1 October 2004)
[18] http://www.eu-egee.org/
[19] Richards A et al 2004 Proc. of the UK e-Science All Hands Meeting (Nottingham, UK, 31 August–3 September
2004) pp 210–7
[20] See, for example, http://www.uscms.org/s&c/dc04/
[21] Strickland D 2004 CMS status for GridPP, Presented at GridPP10 (CERN, Geneva, 2–4 June 2004)
[22] Foster I 2002 What is the Grid? A three point checklist Grid Today July 20
Sign up today - FREE
Mendeley saves you time finding and organizing research. Learn more
- All your research in one place
- Add and import papers easily
- Access it anywhere, anytime