Sign up & Download
Sign in

Quay crane scheduling with handling priority in port container terminals

by Der-Horng Lee, Hui Qiu Wang, Lixin Miao
Engineering Optimization (2008)

Abstract

The quay crane scheduling problem studied in this article is to determine a handling sequence of ship bays for quay cranes assigned to a container ship considering handling priority of every ship bay. This article provides a mixed integer programming model for the considered problem. A genetic algorithm (GA) is proposed to obtain near-optimal solutions. Computational experiments to examine the proposed model and solution algorithm are described. The computational results show that the proposed GA is effective and efficient in solving the considered quay crane scheduling problem.

Cite this document (BETA)

Sign up today - FREE

Mendeley saves you time finding and organizing research. Learn more

  • All your research in one place
  • Add and import papers easily
  • Access it anywhere, anytime

Start using Mendeley in seconds!

Already have an account? Sign in

Readership Statistics

1 Reader on Mendeley
by Discipline
 
by Academic Status
 
100% Student (Master)
by Country
 
100% South Korea