Challenges in Construction over Soft Soil - Case Studies in Malaysia

50Citations
Citations of this article
482Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

Construction on soft ground area is a great challenge in the field of geotechnical engineering. Many engineering problems in the form of slope instability, bearing capacity failure or excessive settlement could occur either during or after the construction phase due to low shear strength and high compressibility of this soil. As main technical agencies responsible for implementation of development projects for Government of Malaysia, Public Works Department has vast experience in dealing with this problematic soil over the years. This paper discussed and elaborate on the engineering problems encountered in construction projects that have been carried out by PWD, namely Core Facilities Building of Polytechnic Kota Kinabalu in Sabah and Hospital Tengku Ampuan Rahimah Integration Quarters in Klang, Selangor. Instability of the ground during construction works had caused delay and cost overrun in completion of the project in Selangor, whereas occurrence of continuous post construction settlement had affected the integrity and serviceability of the building in Sabah. The causes of failure and proposed rehabilitation work for both projects also will be discussed in brief.

Cite

CITATION STYLE

APA

Mohamad, N. O., Razali, C. E., Hadi, A. A. A., Som, P. P., Eng, B. C., Rusli, M. B., & Mohamad, F. R. (2016). Challenges in Construction over Soft Soil - Case Studies in Malaysia. In IOP Conference Series: Materials Science and Engineering (Vol. 136). Institute of Physics Publishing. https://doi.org/10.1088/1757-899X/136/1/012002

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free