Abstract
The development of the bilateral Long Term Vision for the Scheldt Estuary between 1999 and 2001 reveals that it is possible to move from a history of conflict to cooperation in just two years. A retrospective, insider perspective is used to analyse the integrated three-layer hybrid modelling at the heart of this groundbreaking agreement. We tell an untold story of the collaborative eco-morphological modelling activity that served as a boundary object supporting communication and contributing to a model-based metaphor of the intrinsic character of the estuary–its most lasting contribution.
Author supplied keywords
Cite
CITATION STYLE
Slinger, J. H. (2023). Developing the transboundary Long Term Vision of the Scheldt Estuary–an untold story. Water International, 48(8), 1046–1067. https://doi.org/10.1080/02508060.2023.2264668
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.