Mitigation of scour failure risk of a river bridge located in an ungauged basin

3Citations
Citations of this article
10Readers
Mendeley users who have this article in their library.

Abstract

In this study, scour failure risk of the Çatalzeytin Bridge located in the Western Black Sea Basin, Turkey, was assessed for possible future flood events and appropriate scour countermeasures were considered based on economic and constructability considerations. Waterway adequacy in the spans of the bridge and scour criticality around bridge foundations considered for risk calculations in HYRISK were estimated by hydrological and hydraulic analyses of the watershed and stream. Since the watershed of the bridge is ungauged, geomorphological instantaneous unit hydrograph concept was adopted to estimate the peak discharges with various return periods to be used in hydraulic modelling. Monte Carlo simulation results indicated that most of the simulated peak discharges were in the 95% confidence interval. Hydraulic model results from HECRAS indicated that waterway adequacy and scour criticality were critical for discharges with 200 and 500-year return periods. Scour failure risk of the Çatalzeytin Bridge was classified as high and it was proposed to reduce the risk by constructing partially grouted riprap as the most feasible alternative that would consequently increase the expected lifespan of the bridge. Following this methodology, river bridges may be prioritized based on the risk analysis.

Cite

CITATION STYLE

APA

Akay, H. (2021). Mitigation of scour failure risk of a river bridge located in an ungauged basin. Baltic Journal of Road and Bridge Engineering, 16(1), 37–56. https://doi.org/10.7250/bjrbe.2021-16.514

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free