Multi-project scheduling under uncertainty and resource flexibility: a systematic literature review

1Citations
Citations of this article
14Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

A Systematic Literature Review (SLR) on the Resource-Constrained Multi-Project Scheduling Problem (RCMPSP), Uncertainty, and Resource Flexibility (human resource) is presented in this study. The main purpose is to help scholars with an overview of existing techniques and to identify new research directions. After applying exclusion criteria, 107 papers were analysed (2013-2023). The methodology adopted for this SRL is PRISMA. Based on the results, the approaches proposed to solve the RCMPSP were classified and the main findings were presented. The results show that the main focus of the existing research has been devoted to approximate algorithms. Genetic algorithms (GAs) and priority rules (PRs) are the most representative approximate algorithms, with 39% and 18%, respectively. At the same time, mixed integer programming (MIP) (9%) and branch & bound (B&B) algorithms (4%) are the most used exact algorithms. This analysis provides a vivid roadmap for future research based on the collected papers.

Cite

CITATION STYLE

APA

Aghileh, M., Tereso, A., Alvelos, F., & Monteiro Lopes, M. O. (2024). Multi-project scheduling under uncertainty and resource flexibility: a systematic literature review. Production and Manufacturing Research. Taylor and Francis Ltd. https://doi.org/10.1080/21693277.2024.2319574

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free