Modelling and simulating time use of site workers with 4d BIM

8Citations
Citations of this article
56Readers
Mendeley users who have this article in their library.

Abstract

This paper presents a research endeavouring to model site work in a 4D BIM model. Next simulations are performed with this model in 5 scenarios including specific interventions in work organisation, notably changing positons of facilities for site workers. A case study has been done in a construction project in the Netherlands. The research has showed the possibility to model time use of site workers in 4D BIM. Next the research has showed potential to perform and calculate specific interventions in the model, and prospect realistic changes in productive time use as a result.

Cite

CITATION STYLE

APA

Vrijhoef, R., Dijkstra, J. T., & Koutamanis, A. (2018). Modelling and simulating time use of site workers with 4d BIM. In IGLC 2018 - Proceedings of the 26th Annual Conference of the International Group for Lean Construction: Evolving Lean Construction Towards Mature Production Management Across Cultures and Frontiers (Vol. 1, pp. 155–165). The International Group for Lean Construction. https://doi.org/10.24928/2018/0536

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free