A large decommissioning cost for the UK nuclear industry is cable and associated infrastructure for Control and Instruments. If future cable installation is reduced or avoided, this would drastically reduce costs. © The Institute of Measurement and Control 2014.
CITATION STYLE
Nobes, T. S., & Murphy, C. (2014). Deciding to use wireless control and instruments in the UK nuclear industry. Measurement and Control (United Kingdom), 47(2), 58–64. https://doi.org/10.1177/0020294014521392
Mendeley helps you to discover research relevant for your work.