Analisis Pembinaan Dan Pengawasan Terhadap Kinerja Proyek Konstruksi (Studi Kasus Pembangunan Spillway Bendungan Tugu Di Kabupaten Trenggalek)

  • Putraaji L
N/ACitations
Citations of this article
17Readers
Mendeley users who have this article in their library.

Abstract

The purpose of this study was to determine the effect of coaching and supervision on the performance of a construction project (a case study of the Tugu Dam Spillway Development in Trenggalek Regency) simultaneously or partially. The population in this study were 160 employees in the construction of the Tugu Dam Spillway in Trenggalek Regency. The sample used in this study was 100 respondents. The analytical method used is multiple linear regression analysis. The results showed that coaching and supervision had an effect on the performance of construction projects (Case Study of Tugu Dam Spillway Development in Trenggalek Regency) simultaneously, Coaching had an effect on the Performance of Construction Projects (Case Study of Tugu Dam Spillway Development in Trenggalek Regency) partially and Supervision had an effect on Performance Partial Construction Project (Case Study of Tugu Dam Spillway Development in Trenggalek Regency)

Cite

CITATION STYLE

APA

Putraaji, L. F. (2021). Analisis Pembinaan Dan Pengawasan Terhadap Kinerja Proyek Konstruksi (Studi Kasus Pembangunan Spillway Bendungan Tugu Di Kabupaten Trenggalek). Otonomi, 21(1), 106. https://doi.org/10.32503/otonomi.v21i1.1610

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free