This study aims to determine the potential of hybrid renewable energy (micro hydro energy, solar energy and wind energy) as an alternative energy source in the district of Bolango Bone and Gorontalo. This research method starts from a basic collection of reference materials as well as technical and non-technical data, which is followed by observations methods to obtain data on the profile of the hamlet / village location of hybrid renewable energy potential. The result showed that: 1) Electrical energy can be generated by the PLT-Hybrid Energy Tapadaa village of 643.59 kWh per day, Tulabolo village of 1553.69 kWh per day, the village Liyodu 3555.46 kWh per day, and the village South Dulamayo 3322.6 kWh per day. 2). Hybrid potential energy available is quite large but it has not been used optimally. With the current energy needs for Tapada'a village, village Tulabolo, Liyodu village, and the village of South Dulamayo then there are the energy reserves: 605.76 kWh per day for the Tapada'a, 1366.25 kWh per day for the Tulabolo, 3465,88 kWh per day for Liyodu , and 3190,8 kWh per day for the South of Dulamayo
CITATION STYLE
Hasan, E., Ilham, J., & Kamil Amali, L. M. (2016). Potensi Hybrid Energy di Kabupaten Bone Bolango dan Kabupaten Gorontalo. Setrum : Sistem Kendali-Tenaga-Elektronika-Telekomunikasi-Komputer, 4(2), 54. https://doi.org/10.36055/setrum.v4i2.451
Mendeley helps you to discover research relevant for your work.