Multi-objective optimisation of power restoration in electricity distribution systems

2Citations
Citations of this article
8Readers
Mendeley users who have this article in their library.
Get full text

Abstract

This paper proposes a new multi-objective approach for the problem of power restoration in (n-1) contingency situations. It builds on a previous, mono-objective approach introduced in Mendes et al. (2010) [14]. Power restoration normally relies on network reconfiguration, and typically involves re-switching and adjustment of tap-changers and capacitor banks. In this work, we focus on re-switching strategies. The quality of the re-switching strategy is measured in terms of voltage deviations, number of consumers still affected after the reconfiguration, number of overloaded branches and number of switches changes. Due to the number of criteria and conflicting objectives, power restoration is a prime candidate for multi-objective optimisation. The method studied is based on a genetic algorithm and was tested using two real-world networks, with up to of 1,645 branches and 158 switches. We present a contingency example for each network and discuss the results obtained. Finally, we discuss the approach's convergence by analysing the evolution of the solutions that compose the Pareto frontier. © 2011 Springer-Verlag.

Cite

CITATION STYLE

APA

Mendes, A., & Boland, N. (2011). Multi-objective optimisation of power restoration in electricity distribution systems. In Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics) (Vol. 7106 LNAI, pp. 779–788). https://doi.org/10.1007/978-3-642-25832-9_79

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free