Integrated generation of working time models and staff schedules in workforce management

6Citations
Citations of this article
6Readers
Mendeley users who have this article in their library.
Get full text

Abstract

Our project addresses the question how to automatically and simultaneously assign staff to workstations and generate optimised working time models on the basis of fluctuating personnel demand while taking into account practical constraints. Two fundamentally different solution approaches, a specialized constructive heuristic (commercial) and a hybrid metaheuristic (the evolution strategy) that integrates a repair heuristic to remove contraint violations are compared on a complex real-world problem from a retailer. The hybrid approach clearly outperforms the tailored constructive method. Taken together with our similar findings on a related staff scheduling problem from logistics this result suggests that the evolution strategy, despite its original focus on continuous parameter optimisation, is a powerful tool in combinatorial optimisation and deserves more attention. Moreover, hybridising a metaheuristic with a problem-specific repair heuristic seems a useful approach of resolving the conflict between domain-specific characteristics of a real-world problem and the desire to employ generic optimisation techniques, at least in the domain of workforce management. © 2011 Springer-Verlag.

Cite

CITATION STYLE

APA

Nissen, V., Günther, M., & Schumann, R. (2011). Integrated generation of working time models and staff schedules in workforce management. In Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics) (Vol. 6625 LNCS, pp. 491–500). https://doi.org/10.1007/978-3-642-20520-0_50

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free