Coordination Hydrothermal Interconnection Java-Bali Using Simulated Annealing

2Citations
Citations of this article
10Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

Hydrothermal power plant coordination aims to minimize the total cost of operating system that is represented by fuel costand constraints during optimization. To perform the optimization, there are several methods that can be used. Simulated Annealing (SA) is a method that can be used to solve the optimization problems. This method was inspired by annealing or cooling process in the manufacture of materials composed of crystals. The basic principle of hydrothermal power plant coordination includes the use of hydro power plants to support basic load while thermal power plants were used to support the remaining load. This study used two hydro power plant units and six thermal power plant units with 25 buses by calculating transmission losses and considering power limits in each power plant unit aided by MATLAB software during the process. Hydrothermal power plant coordination using simulated annealing plants showed that a total cost of generation for 24 hours is $ 13,288,508.01.

Cite

CITATION STYLE

APA

Wicaksono, B., Abdullah, A. G., & Saputra, W. S. (2016). Coordination Hydrothermal Interconnection Java-Bali Using Simulated Annealing. In IOP Conference Series: Materials Science and Engineering (Vol. 128). Institute of Physics Publishing. https://doi.org/10.1088/1757-899X/128/1/012005

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free