Abstract
Absence of phase is a very common and serious problem in every sector, at home or workplace. Many times, one or two phases in three phase supply cannot be live. Regardless of this, certain electrical equipment in one room and OFF in another room would be on, several times. This causes considerable disturbance to our routine work. This paper is intended to test the availability of any live phase, and will only link the load to the specific live phase. There is only one phase available, and then the load will still be ON. The idea is conceived with ARDUINO. This controller continually checks the live state of all connected phases, using a Relay the load is connected to active phase by controller. Transistor is operated the relay.When two or more phases are active but load is only connected to phase 1,that active phase number is display in LCD for observation.
Cite
CITATION STYLE
Kumar, D. A., Reddy, Dr. T. R. S., … Sirisha, P. (2020). Automatic Working Phase Picker for Domestic load from Three phase supply. International Journal of Recent Technology and Engineering (IJRTE), 9(2), 973–975. https://doi.org/10.35940/ijrte.b3842.079220
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.