Abstract
Globally, road freight accounts for 40% of the CO2 emissions in the transport sector, mainly from heavy-duty vehicles (HDVs). All the major truck markets have introduced fuel efficiency regulations for HDV, and the more ambitious regulations require the introduction of zero-emission HDV, for which battery electric trucks (BEVs) are a promising candidate. However, frequent long-distance trips require a dense public high-power charging network if BEV are to meet today's operating schedules in logistics. Here, we develop a model for public BEV high-power fast-charging that uses widely available traffic count data as input and combines this with on-site queueing models. We apply the model to Germany and obtain a fast-charging network where average waiting times do not exceed 5 min. For 15% BEV in the truck stock and 50% public charging, the model shows 267 charging locations, each with 2-8 charging points per location, for a dense network with 50 km distance between charging locations. We calculated 142 charging locations with 2-13 charging points for a wider network with 100 km distance between locations. Our results help to design future charging infrastructure for electric road freight transport.
Author supplied keywords
Cite
CITATION STYLE
Speth, D., Plötz, P., Funke, S., & Vallarella, E. (2022). Public fast charging infrastructure for battery electric trucks—a model-based network for Germany. Environmental Research: Infrastructure and Sustainability, 2(2). https://doi.org/10.1088/2634-4505/ac6442
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.