Entwurf eines optimalen Seillinienlayouts für die Holzernte in steilem Gelände

1Citations
Citations of this article
5Readers
Mendeley users who have this article in their library.

Abstract

Cable-based technologies are a backbone when designing harvesting systems for steep slopes. However, layout and placement of the cable roads are challenging. To guarantee that harvesting costs are minimized and that the process has the least environmental impact on the remaining forest, one must carefully locate both cable towers and cable roads. Our study objectives were to 1) develop an approach of mixed integer linear programming for planning an optimal harvesting and cable road layout and 2) test this methodology on a specific site, then observe its behaviour with single- and multi-objective alternatives and evaluate its practicality. In doing so, we determined that fitting the model to terrain units up to 35 ha provided the best results and within a reasonable timeframe. The approach presented here is the first to consider both environmental and economic objectives, and can determine the optimal cable road layout within the shortest time.

Cite

CITATION STYLE

APA

Bont, L. (2013). Entwurf eines optimalen Seillinienlayouts für die Holzernte in steilem Gelände. Schweizerische Zeitschrift Fur Forstwesen, 164(11), 321–327. https://doi.org/10.3188/szf.2013.0321

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free