… All control objects will achieve the same quality level in the design phase (and in subsequent phases) … Correct quality levels on each control object for each discipline to each milestone in the design phase can be reached by fulfilling relevant checklists …
CITATION STYLE
Mejlænder-Larsen, Ø. (2015). Using BIM to follow up milestones in a project plan during the design phase. In Building Information Modelling (BIM) in Design, Construction and Operations (Vol. 1, pp. 97–106). WIT Press. https://doi.org/10.2495/bim150091
Mendeley helps you to discover research relevant for your work.