Proposal for improvement in maintenance and logistics according to Linear Scheduling, KPI and EOQ to reduce cost overruns at Transportes Joselito S.A.C., Moche 2021

1Citations
Citations of this article
18Readers
Mendeley users who have this article in their library.

Abstract

The research carried out sought to determine to what extent the proposal for improvement in maintenance and logistics according to linear programming theory, KPI and EOQ influences the cost overruns of the company Transportes Joselito S.A.C. Visits were made to the company, interviews with the heads of the analyzed areas and a review of documents delivered by them; then the respective mathematical calculations of the collected data. It was determined that the cost overruns in both areas were S/108, 182.27. An improvement proposal was designed integrating linear programming, KPI, EOQ and the results of implementing it in the company were simulated in ProModel. It was determined that the cost overruns after the improvement proposal represented a reduction of 85.64% and a monetary benefit of S/92, 648.08. The proposal obtained an IRR of 68%, a NPV of S/25, 285.05 and a B/C of 3.29, indicating that it is profitable to implement it.

Cite

CITATION STYLE

APA

Viar Narro, A. B., Muñiz Luna Victoria, M. S. C., & Adrianzén, M. A. (2022). Proposal for improvement in maintenance and logistics according to Linear Scheduling, KPI and EOQ to reduce cost overruns at Transportes Joselito S.A.C., Moche 2021. In Proceedings of the LACCEI international Multi-conference for Engineering, Education and Technology (Vol. 2022-July). Latin American and Caribbean Consortium of Engineering Institutions. https://doi.org/10.18687/LACCEI2022.1.1.147

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free