Two-stage based dynamic earth-rock transportation assignment problem under fuzzy random environment to earth-rock dam construction

10Citations
Citations of this article
13Readers
Mendeley users who have this article in their library.

Abstract

This paper discusses a two-stage based dynamic transportation assignment problem (TS-based DTAP) under a fuzzy random environment in an earth-rock transportation system. This problem is a multi-objective dynamic programming optimization process for minimizing total operational cost, transportation duration and total waste. Triangular fuzzy random numbers are used for the uncertain parameters, and a hybrid crisp approach and an expected value operator are introduced to deal with these uncertainties. A dynamic programming based contraction particle swarm optimization is developed to solve the proposed expected value model for TS-based DTAP. Then, the earth-rock dam construction at Pubugou Hydropower project is used as a practical application to verify the proposed approach. Results and analysis are presented to highlight the performance of the proposed TS-based DTAP model and the optimization method, which proves to be effective and relatively efficient compared to the models under other environments and a standard PSO algorithm.

Cite

CITATION STYLE

APA

Xu, J., & Feng, C. (2015). Two-stage based dynamic earth-rock transportation assignment problem under fuzzy random environment to earth-rock dam construction. Journal of Civil Engineering and Management, 21(6), 775–797. https://doi.org/10.3846/13923730.2014.893909

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free