Economic Analyses of the Seadrift Wind-Aided Wastewater Treatment Plant Operations

1Citations
Citations of this article
6Readers
Mendeley users who have this article in their library.

Abstract

Seadrift is a city located on the Texas Gulf Coast with a population of 1,364 people as of the 2010 U.S. Census. In 2012, the city started operating a $610,878 wind turbine, dedicated to its wastewater treatment plant. The city contributed only 3% of the funds for the project, with the balance from state agencies or the state of Texas. The city hoped to save $25,500 yearly using wind energy to displace some of the plant’s electrical demand. The plant’s average load is 0.05 million gallons per day, requiring 236,000 kilowatt-hours (kWh; 8.05x108 British thermal units [BTU]) yearly. From 2012 to 2015, Seadrift saved $15,928 per year, with yearly wind energy production of 155,738 kWh (5.31x108 BTU) and net present value of $211,493 at the city level. Yet, the project’s applicability to other locations is limited. Indeed, when considering the project’s total cost and return, the economic results, driven by a lower than predicted wind speed, are negative. Still, the study serves as a valuable tool to aid government agencies and rural communities in devising alternative and sustainable solutions to water-energy nexus challenges in Texas and beyond.

Cite

CITATION STYLE

APA

Abena Mbarga, A. H., Rainwater, K., Song, L., Cleveland, T., & Ross Williams, W. (2021). Economic Analyses of the Seadrift Wind-Aided Wastewater Treatment Plant Operations. Texas Water Journal, 12(1), 42–57. https://doi.org/10.21423/twj.v12i1.7096

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free