Automatic assembly of wind load from BIM-model

1Citations
Citations of this article
7Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

In recent years many Russian construction companies have started using technologies of building information modelling (hereinafter - BIM). It's a global trend aimed at maximum automation and acceleration of a design process and documentation approval. This article shows main advantages of the BIM approach, discusses the possibility of expanding "the space of benefits"by using digital building models for wind load simulation (automatization of this process). Currently, applied methods of wind impact analysis based on which automation is possible are described. Potential application scenarios, describing the advantages of automatic wind load assembly, are listed. Also, possible approach to the analysis of loads in process of BIM-design is shown.

Cite

CITATION STYLE

APA

Degtyarev, N., Pridvizhkin, S., & Salnikov, V. (2020). Automatic assembly of wind load from BIM-model. In IOP Conference Series: Materials Science and Engineering (Vol. 962). IOP Publishing Ltd. https://doi.org/10.1088/1757-899X/962/2/022072

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free