Modelling and Optimisation of Deviation in Hydro Power Production

  • Winkler D
  • Thoresen H
  • Andreassen I
  • et al.
N/ACitations
Citations of this article
13Readers
Mendeley users who have this article in their library.

Abstract

In 2009 a new price system for the produced power was introduced for Norwegian hydro power plants. Basically a power producer gets punished if his production deviates from the scheduled production. The power plant is paid for the actual production: if too much power is produced that the price for the excess power is low. Even worse if too little power is produced the power plant has to pay a fine. If such deviation occurs it is very important to identify components/systems that are responsible on order to adjust the controller or replace the faulty equipment. This paper describes the first step in problem solving, by presenting the development of a model of a hydro power plant that shows differing power production. The modelling part was done in Modelica\myr using the \HPL of Modelon AB. The model was parametrised using construction data and validated using data from test and operation runs.

Cite

CITATION STYLE

APA

Winkler, D., Thoresen, H. M., Andreassen, I., Perera, M. A. S., & Sharefi, R. B. (2011). Modelling and Optimisation of Deviation in Hydro Power Production. In Proceedings from the 8th International Modelica Conference, Technical Univeristy, Dresden, Germany (Vol. 63, pp. 18–27). Linköping University Electronic Press. https://doi.org/10.3384/ecp1106318

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free