Regression Model to Estimate Standard Time through Energy Consumption of Workers in Manual Assembly Lines under Moderate Workload

  • Ayabar A
  • De la Riva J
  • Sanchez J
  • et al.
N/ACitations
Citations of this article
10Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

We propose a Standard Time (ST) Estimate Model based on energy demand to attain more equal work distribution in manual assembly lines. The proposal was developed estimating the energy consumption by monitoring the heart rate (HR) of 84 people between 18 and 48 years old while performing repetitive activities under moderate workload (2.5–5.0 kilocalories/minute (Kcal/min)). Variables on one model were determined, which were based on energy consumption (EC) using the 13-variable Best-Subset function. Subsequently, a general equation for the Standard Time (ST) Estimate Model was calculated through lineal regression. Two significant variables were obtained: total kilocalories (Kcal tot.)/pieces and total Kcal/operation time (OT) for each station, which are included in a Standard Time Estimate Model. ST can be represented with a regression model measuring the total number of kilocalories consumed by workers and the OT, which can help companies to balance the cycle time in their assembly lines.

Cite

CITATION STYLE

APA

Ayabar, A., De la Riva, J., Sanchez, J., & Balderrama, C. (2015). Regression Model to Estimate Standard Time through Energy Consumption of Workers in Manual Assembly Lines under Moderate Workload. Journal of Industrial Engineering, 2015, 1–5. https://doi.org/10.1155/2015/382673

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free