Coordination between Understanding Historic Buildings and BIM Modelling: A 3D-Output oriented and typological data capture method

2Citations
Citations of this article
9Readers
Mendeley users who have this article in their library.

Abstract

At the present, in trend of shifting the old 2D-output oriented survey to a new 3D-output oriented survey based on BIM technology, the corresponding working methods and workflow for data capture, process, representation, etc. have to be changed.Based on case study of two buildings in the Summer Palace of Beijing, and Jiayuguan Pass at the west end of the Great Wall (both World Heritage sites), this paper puts forward a “structure-and-type method” by means of typological method used in archaeology, Revit family system, and the tectonic logic of building to realize a good coordination between understanding of historic buildings and BIM modelling.

Cite

CITATION STYLE

APA

Li, K., Li, S. J., Liu, Y., Wang, W., & Wu, C. (2015). Coordination between Understanding Historic Buildings and BIM Modelling: A 3D-Output oriented and typological data capture method. In International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences - ISPRS Archives (Vol. 40, pp. 283–288). International Society for Photogrammetry and Remote Sensing. https://doi.org/10.5194/isprsarchives-XL-5-W7-283-2015

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free