Risk assessment based on combined weighting-cloud model of tunnel construction

13Citations
Citations of this article
13Readers
Mendeley users who have this article in their library.

Abstract

In order to reduce the tunnel construction accidents and ensure the safety of personnel, a comprehensive assessment method of tunnel construction risk based on combination weighting and cloud model is constructed according to the characteristics of tunnel construction. The risk assessment index system is established based on researches on engineering geological condition, natural environmental condition, Tunnel engineering design scheme and construction management. On this basis, the tunnel risk is divided into 4 levels and the index risk level standard is proposed. In order to improve the rationality of weighting, a weight calculation method based on AHP, entropy method and Lagrange multiplier method is constructed. Finally, the normal cloud generator is used to form comparison pictures of risk clouds and standard clouds, which demonstrates the risk status of the evaluation indexes at all levels. With reference to Deda Tunnel of Sichuan-Tibet Railway engineering of high integrated risk level, management decision-making is required. The evaluation results are basically consistent with engineering practices, proving that the method has good feasibility and applicability.

Cite

CITATION STYLE

APA

Wang, J. C., Liu, J. Q., Wei, Q., & Wang, P. (2021). Risk assessment based on combined weighting-cloud model of tunnel construction. Tehnicki Vjesnik, 28(1), 203–210. https://doi.org/10.17559/TV-20200917163330

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free