Scheduling opportunistic links in two-tiered reconfigurable datacenters

18Citations
Citations of this article
11Readers
Mendeley users who have this article in their library.
Get full text

Abstract

Reconfigurable optical topologies are emerging as a promising technology to improve the efficiency of datacenter networks. This paper considers the problem of scheduling opportunistic links in reconfigurable datacenters such as ProjecToR. We study the online setting and aim to minimize flow completion times. The problem is a two-tier generalization of classic switch scheduling problems. We present a stable-matching algorithm which is O(ϵ -2 )-competitive against an optimal offline algorithm, in a resource augmentation model: the online algorithm runs 2+ϵ times faster. Our algorithm and result are fairly general and allow for different link delays and also apply to hybrid topologies which combine fixed and reconfigurable links. Our analysis is based on LP relaxation and dual fitting.

Cite

CITATION STYLE

APA

Kulkarni, J., Schmid, S., & Schmidt, P. (2021). Scheduling opportunistic links in two-tiered reconfigurable datacenters. In Annual ACM Symposium on Parallelism in Algorithms and Architectures (pp. 318–327). Association for Computing Machinery. https://doi.org/10.1145/3409964.3461786

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free