Optimization Model Calculation of Construction Cost and Time Based on Genetic Algorithm

4Citations
Citations of this article
14Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

In the process of multi-objective problems, traditional algorithms have certain defects, especially because of the increasing number of conflicts and the increasingly complex application environment. This paper proposes a practical method to solve the multi-objective optimization problem for the duration and cost requirements in the construction project management, in order to reduce the error probability that the optimized project will produce in the actual project. Different from the existing optimization methods, this design modifies the curve of the time cost, and improves the parameters of the traditional genetic algorithm design and operation process design, which greatly increases the degree of fitness between the algorithm and the actual project. The model is based on genetic algorithms and combines different algorithms, so a simple and excellent Pareto solution can be quickly obtained. At the same time, optimization and simulation are carried out in an orderly way during the construction period. This new method is reasonable and effective in the very complicated multi-objective optimization problem of managing construction period and cost through an engineering example.

Cite

CITATION STYLE

APA

He, W., Shi, Y., & Kong, D. (2019). Optimization Model Calculation of Construction Cost and Time Based on Genetic Algorithm. In IOP Conference Series: Earth and Environmental Science (Vol. 242). Institute of Physics Publishing. https://doi.org/10.1088/1755-1315/242/6/062044

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free