Abstract
Some usual hydrological methods and the hydrological model EBA4SUB are used in the paper to determine the design peak discharge for various return periods for catchments in Bosnia and Herzegovina. The aim of the paper is to test for the first time the EBA4SUB model in the selected catchments. The results obtained by the EBA4SUB model compare well with other related methods. The advantages of the model lie in the fact that it takes into account physical processes taking place in the catchment, influencing formation of surface runoff.
Author supplied keywords
Cite
CITATION STYLE
Petroselli, A., Mulaomerović-Šeta, A., & Lozančić, Ž. (2019). Comparison of methodologies for design peak discharge estimation in selected catchments of Bosnia and Herzegovina. Gradjevinar, 71(9), 729–738. https://doi.org/10.14256/JCE.2611.2019
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.