Cost-Volume-Profit Analysis Untuk Kondisi Uncertainty

  • Dianawati W
N/ACitations
Citations of this article
8Readers
Mendeley users who have this article in their library.

Abstract

AbstrackHotels tend to have a high level of fixed cost owing to the levels of investment required. This should result in above normal profits in good times, as variable costs remaining will form a smaller proportion of additional revenue. However, while high profits can be achieved above the break-even point, high losses will result if revenue is significantly reduced. Thus much attention is given to the traditional CVP model (which ignores uncertainty), as failure to cover fixed costs in the long term can result bankruptcy for organization. This article examines the basic CVP model and describes how to include uncertainty during the decision making process.Key words: CVP model, Break-Even Point, uncertainty

Cite

CITATION STYLE

APA

Dianawati, W. (2010). Cost-Volume-Profit Analysis Untuk Kondisi Uncertainty. AKRUAL: Jurnal Akuntansi, 2(1), 43. https://doi.org/10.26740/jaj.v2n1.p43-54

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free