Planning, scheduling and resource optimization for road construction

2Citations
Citations of this article
18Readers
Mendeley users who have this article in their library.
Get full text

Abstract

In1916, the construction of Railway station in Guntur was done at that time; there as was full of small fresh water rivers near Guntur bus stand and near railway station and flow of water from bus stand to railway station is known as pichukalagunta. There is a low level water passage below the railway track was established. After few years the area was developed and the low level passage was become used for traffic flow. But at the time of rainy season the water gets stagnated. And the route is in much usage in normal seasons because it is shortest route to go from bus stand to lakshmipuram and railway station. We are not only giving the station for that low lying area sand also Estimating the cost that required for using porous material for reducing the Stagnant of water in that particular area. During this study, we found that solution which we use percolate the water into the ground surface and also cost estimation in primavera software.

Cite

CITATION STYLE

APA

Kiran Kumar, J., Victor, K., & Naomi Nischala, K. (2019). Planning, scheduling and resource optimization for road construction. International Journal of Recent Technology and Engineering, 8(3), 2625–2629. https://doi.org/10.35940/ijrte.C4929.098319

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free