Cycle time analysis of tipping trailer frame: A case study in a heavy equipment industry

5Citations
Citations of this article
19Readers
Mendeley users who have this article in their library.

Abstract

A key element with which manufacturing industries should concern themselves in respect of cost and efficiency of operation is the cycle time for preparing their products. A reduction in operational time can result in dramatic improvements in both cost and efficiency. Unfortunately, cycle time problems are sometimes difficult to analyse: there are many factors related to this parameter. This paper presents a cycle time analysis of a tipping trailer frame in a heavy equipment industry. The cycle time analysis, based on the cycle time data collected by a time study, together with the use of an Arena software simulation, is outlined. From the results of this study, it was found that the manufacturing cycle time was 56 hours, and that resources were under-utilised.

Cite

CITATION STYLE

APA

Marsudi, M., & Shafeek, H. (2014). Cycle time analysis of tipping trailer frame: A case study in a heavy equipment industry. South African Journal of Industrial Engineering, 25(1), 176–188. https://doi.org/10.7166/25-1-636

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free