Abstract
Common problems that occur in the implementation of the project are usually related to time, cost and quality. In construction projects there are often delays in completion of project activities that exceed the set time, therefore the application of time management on a project can be completed on time even faster than the predetermined time. The purpose of this writing is to analyze the performance of time by comparing the weight of work on the plan S curve and the realization S curve so as to generate deviation from project delays and know the factors causing project delays and apply visualization project to Tekla Structures software to know the progress of the work. The data used are As build Drawing, curve S plan and curve S realization as well as the results of analysis from the interview. This research method is done through S curve method and interview. The results of this study were obtained that the project experienced delays with the highest deviation in September 2018 of -36.425% as well as the factors causing delays in this project are tool delays, weather factors and design changes.
Cite
CITATION STYLE
Fahmi, F., & Safitri, M. (2021). Time Performance Analysis and Implementation of Building Information Modeling (BIM) for Project Visualization on Cipamingkis Bridge Construction Project 2 Deltamas City. ADRI International Journal of Engineering and Natural Science, 6(01), 21–27. https://doi.org/10.29138/aijens.v6i01.26
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.