This research investigates and evaluates the University Politehnica of Bucharest (UPB) possibilities to become an energy self-supplying by building up its own power plant and becoming an energy distributor. The campus has already been connected to the national natural gas supplying pipe and the local district heating and electrical network. A set of criteria was used to evaluate the feasibility of this project. Technical, financial, and environmental considerations were taken into account to determine the most suitable solution. The feasibility study assumed three proposals of an energy supply system considered for the university buildings/campus. Gas-fired heating plant, gas-fired Internal Combustion Engine cogeneration plant and gas fired Internal Combustion Engine for cogeneration with an Organic Rankine Cycle ORC. The details of each proposal were discussed to obtain the optimum solution. Elaborate. It was found from a financial and environmental perspective that the most feasible project is gas-fired Internal Combustion Engine cogeneration, considering profit revenue from selling/exporting power to the domestic electricity grid. And the Net Present Value was around one million euros for 15 years life.
CITATION STYLE
Dabbas, A. A., Al-Hyari, L., Al Awana, A. D. M., & Fawaier, M. (2021). Energetic Investigation and Economic Feasibility for a University Campus in Romania towards Becoming an Energy Supplier. Periodica Polytechnica Mechanical Engineering, 65(2), 180–188. https://doi.org/10.3311/PPme.17361
Mendeley helps you to discover research relevant for your work.