A Framework for Construction-related Risks by integrating the Fuzzy Grey Comprehensive Evaluation Method (FGCE)

2Citations
Citations of this article
7Readers
Mendeley users who have this article in their library.
Get full text

Abstract

There are five basic phases for construction projects: planning, design, tendering, construction and maintenance. The risks of each phase have an impact on time, cost, and quality. In this paper, the tendering phase of the residential complex project was investigated as a case study, and the creation of a fuzzy and grey correlation analysis model was examined using a fuzzy theory and a grey correlation theory to dispel the professional judgment around the project phase. Creating a comparison and a reference matrix based on grey theory and/by examining factors and their impact on duration, cost, and quality separately, gives the construction investors a scientific, direct, flexible, and adaptable technique to assess project risks. The described method categorized the tendering phase risk based on the three project determinants: duration, cost, and quality. The correlation degree is greater than 0.5, hence construction project duration risk is almost nonexistent. The project investor must also investigate risk assumption, reduction, diversion, and evasion tactics to handle cost and quality risks, which are between 0.2 and 0.5. This suggests that tender phase issues do not affect project length but do affect cost and quality, requiring attention and action.

Cite

CITATION STYLE

APA

Jalhoom, R. J. K., & Mahjoob, A. M. R. (2024). A Framework for Construction-related Risks by integrating the Fuzzy Grey Comprehensive Evaluation Method (FGCE). Engineering, Technology and Applied Science Research, 14(5), 16736–16739. https://doi.org/10.48084/etasr.8129

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free