Evaluation of loading and hauling technology for improving andesite mine performance

2Citations
Citations of this article
10Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

This paper evaluates the utilization of loading and hauling technology at andesite mine using cycle time and match factor methods. One mine site operated by PT. Anugerah Karya Agra Sentosa was taken as a case study. PT. Anugerah Karya Agra Sentosa located in Mujahiddin Village, Plampang Sub-district, West Sumbawa Regency is an andesite mining using open pit system with quarry type method. Mechanical equipment that operates is one unit Excavator (Kobelco SK 200) capacity 0.9 m3 and five units Dump Truck (Toyota Dyna 130 HT) with bucket capacity 3.6 m3. The analysis results found that the average cycle time for loading equipment was 0.54 minutes while the average cycle time for hauling equipment was 14.58 minutes. Recalculation for match factor (MF=1) resulted in additional of two hauling equipments from five units to seven units (Dump Truck).

Cite

CITATION STYLE

APA

Adiansyah, J. S., Payadi, K., Alpiana, & Rahmawati, D. (2018). Evaluation of loading and hauling technology for improving andesite mine performance. In IOP Conference Series: Materials Science and Engineering (Vol. 403). Institute of Physics Publishing. https://doi.org/10.1088/1757-899X/403/1/012048

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free