Optimization of the Construction Schedule for Paving a Parking Area with Concrete

0Citations
Citations of this article
6Readers
Mendeley users who have this article in their library.

Abstract

The article presents the problem of balancing work for schedules carried out in accordance with Linear Construction Methods. An example is presented of the construction of concrete surface. A number of schedules were developed for the collected data. The preeminent schedule was chosen and then optimized by curtailing working time of preceding working brigades with aid of subsequent brigades. The article presents a model which assumes that the effectiveness is equal for all brigades. Such an assumption was possible due to the nature of the activities to be performed.

Cite

CITATION STYLE

APA

Krzemiński, M. (2016). Optimization of the Construction Schedule for Paving a Parking Area with Concrete. In Procedia Engineering (Vol. 153, pp. 349–354). Elsevier Ltd. https://doi.org/10.1016/j.proeng.2016.08.126

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free