A Branch-and-Price algorithm for railway rolling stock rescheduling

43Citations
Citations of this article
68Readers
Mendeley users who have this article in their library.
Get full text

Abstract

How to best reschedule their fleet of rolling stock units during a disruption is an optimization problem regularly faced by railway operators. Despite the problem's high complexity, it is still usually solved manually. In this paper we propose a path based mathematical formulation and solve it using a Branch-and-Price algorithm. We demonstrate that, unlike flow based approaches, our formulation is more easily extended to handle certain families of constraints, such as train unit maintenance restrictions. The proposed algorithm is benchmarked on several real-life instances provided by the suburban railway operator in Copenhagen, DSB S-tog. When used in combination with a lower bound method taken from the literature we show that near-optimal solutions to this rescheduling problem can be found within a few seconds. Furthermore, we show that the proposed methodology can be used, with minor modification, on a tactical planning level, where it produces near-optimal rolling stock schedules in minutes of CPU time.

Cite

CITATION STYLE

APA

Lusby, R. M., Haahr, J. T., Larsen, J., & Pisinger, D. (2017). A Branch-and-Price algorithm for railway rolling stock rescheduling. Transportation Research Part B: Methodological, 99, 228–250. https://doi.org/10.1016/j.trb.2017.03.003

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free