Gain scheduling controllers are considered in this paper. The gain scheduling problem where the scheduling parameter vector θ cannot be measured directly, but needs to be estimated is considered. An estimation of the scheduling vector θ has been derived by using the Youla parameterization. The use of the Youla parameterization in connection with estimation of θ directly gives a validation method for the estimate of θ. The validation part is an integrated part of the estimation method. This will make it possible to estimate the parameter vector θ very precisely. This is important in connection with H∞ gain scheduling controllers.
CITATION STYLE
Niemann, H., & Stoustrup, J. (1999). Gain scheduling using the Youla parameterization. In Proceedings of the IEEE Conference on Decision and Control (Vol. 3, pp. 2306–2311). IEEE. https://doi.org/10.1109/cdc.1999.831265
Mendeley helps you to discover research relevant for your work.