Gain scheduling using the Youla parameterization

13Citations
Citations of this article
10Readers
Mendeley users who have this article in their library.
Get full text

Abstract

Gain scheduling controllers are considered in this paper. The gain scheduling problem where the scheduling parameter vector θ cannot be measured directly, but needs to be estimated is considered. An estimation of the scheduling vector θ has been derived by using the Youla parameterization. The use of the Youla parameterization in connection with estimation of θ directly gives a validation method for the estimate of θ. The validation part is an integrated part of the estimation method. This will make it possible to estimate the parameter vector θ very precisely. This is important in connection with H∞ gain scheduling controllers.

Cite

CITATION STYLE

APA

Niemann, H., & Stoustrup, J. (1999). Gain scheduling using the Youla parameterization. In Proceedings of the IEEE Conference on Decision and Control (Vol. 3, pp. 2306–2311). IEEE. https://doi.org/10.1109/cdc.1999.831265

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free