Knowledge-based factory scheduling: Resource allocation and constraint satisfaction

4Citations
Citations of this article
6Readers
Mendeley users who have this article in their library.
Get full text

Abstract

Scheduling is a difficult task. Much of the difficulty stems from the need to allocate the limited resources to attend to a large and diverse set of constraints. In this paper, the author highlights the conflict situations that occur between constraint satisfaction and resource availability and among constraints themselves. These conflict situations hamper the satisfaction of contraints. Through a detailed analysis of the scheduling process, it is suggested that the central problem in scheduling is how to predict the future impact of current decisions. In answer, two predictive techniques are proposed, reinforcement scheduling and a decomposition approach. Reinforcement scheduling advocates that before constructing a schedule some rough utilization plans (reinforcement plans) can be built as a basis for generating decision-making guidelines for detailed scheduling. The decomposition approach argues that it is ineffective to try to satisfy all the constraints in a single scheduling process. This method considers different constraints in different processes. Based on these ideas a scheduling system called RESS-II has been implemented. Test results have shown that these techniques are effective in performing their tasks. © 1993.

Cite

CITATION STYLE

APA

Liu, B. (1993). Knowledge-based factory scheduling: Resource allocation and constraint satisfaction. Expert Systems With Applications, 6(3), 349–359. https://doi.org/10.1016/0957-4174(93)90060-J

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free