PV Rooftop Repowering Potential in Indonesia: Study Case

2Citations
Citations of this article
19Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

Indonesia is intensively building solar energy, which divided into three types, namely rooftop, solar farm, and floating solar with a target-installed capacity of 37.15 GW. A lot of land area is required for the development of solar energy for the next 20-25 years. The average land area required for 1 PV module is approximately 2 m2, so it is predicted that the new land area needed will be difficult to obtain in the future. Repowering is a solution to deal with these potential problems, repowering is an interesting new business in Europe when we have to face power plants that have entered the end-of-life. The study aims to analyze if repowering is implemented, we can reduce the Levelized Cost of Electricity. A plant with a capacity of 1.4 MWp will be used as the basis for the simulation. Using a monitoring system to see energy production, temperature, irradiance, and performance ratio is used as the methodology for collecting data. After that, it will analyze from a technical and economic point of view. The result shows that energy production increased by 24% or by 10,645,786 kWh and the Levelized Cost of Electricity decreased by 0.02 USD/kWh with an IRR of 5.67% and a payback period of 14.5 years. This study finds that repowering can reduce electricity tariffs and increase energy production.

Cite

CITATION STYLE

APA

Barran, I., & Setiawan, E. A. (2022). PV Rooftop Repowering Potential in Indonesia: Study Case. In IOP Conference Series: Earth and Environmental Science (Vol. 997). IOP Publishing Ltd. https://doi.org/10.1088/1755-1315/997/1/012016

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free