Use of excel worksheets with user-friendly interface to minimize the makespan in a permutation flow shop production system

  • Rocha R
  • Ravagnani M
  • Andrade C
  • et al.
N/ACitations
Citations of this article
11Readers
Mendeley users who have this article in their library.

Abstract

Current research addresses the Permutation Flow Shop scheduling problem, characterized as Production Scheduling in Batch Process (PSBP) to minimize total time to complete the schedule (Makespan). A method to approach the problem of production scheduling is to turn it into Mixed Integer Linear Programming (MILP) and to solve it by using commercial mathematical programming packages. An electronic spreadsheet with user-friendly interface (ESUFI) was developed in Microsoft Excel. Results showed that it is possible to use ESUFI to solve small problems.

Cite

CITATION STYLE

APA

Rocha, R. P. da, Ravagnani, M. A. S. S., Andrade, C. M. G., & Paraíso, P. R. (2014). Use of excel worksheets with user-friendly interface to minimize the makespan in a permutation flow shop production system. Acta Scientiarum. Technology, 36(3), 453. https://doi.org/10.4025/actascitechnol.v36i3.14928

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free