Wind energy potential and cost estimation of wind energy conversion systems (WECSs) for electricity generation in the eight selected locations of Tigray region (Ethiopia)

  • Gaddada S
  • Kodicherla S
N/ACitations
Citations of this article
73Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

Wind energy is one of the most cost-effective forms of renewable energy source with significant increment in yearly installed capacities all around the world. In this study, three commercial wind turbines, namely POLARIS P15-50, POLA-RIS P50-500 and VESTAS V110-2.0, were chosen as large-scale wind energy conversion systems (WECSs) for technical assessment of electric power generation in eight selected locations spreading across the Tigray region of Ethiopia. The economic evaluations of these three WECSs for electric power generation in the selected locations were estimated using present value of cost (PVC) method. These results showed that the highest capacity factor is obtained as 7.873 % using VESTAS V110-2.0 at Mekele, while the lowest as 0.002 % using POLARIS P15-50 at Shire. Average minimum cost per kWh obtained at Mekele was 0.0011$/kWh using VESTAS V110-2.0, while the highest average cost was 7.3148$/kWh using POLARIS P15-50 at Shire. Furthermore, it can be suggested that Atsbi, Chercher, Mekele and Senkata were most profitable for electrical and mechanical applications than hydropower cost in the country.

Cite

CITATION STYLE

APA

Gaddada, S., & Kodicherla, S. P. K. (2016). Wind energy potential and cost estimation of wind energy conversion systems (WECSs) for electricity generation in the eight selected locations of Tigray region (Ethiopia). Renewables: Wind, Water, and Solar, 3(1). https://doi.org/10.1186/s40807-016-0030-8

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free