Abstract

This report describes a pilot test at Tianziling MSW landfill to assess the feasibility of lowering the leachate level using horizontal wells. Three horizontal wells S01, S02 and S03 (length 50 m, 56 m and 55 m, respectively) were successfully installed using the improved directional pipe-protected drilling method. The average leachate flow rate of S01 and S03 were 10.66 m 3 /day and 3.93 m 3 /day, respectively after installation of the pipes. After 94 days draining of S01, the maximum and average leachate level drawdowns around S01 were 2.7 m and 1.7 m, respectively. After 42 days draining of S03, the maximum and average leachate level drawdowns around S03 were 1.5 m and 1.1 m, respectively. The radius of influence for S01 and S03 were in the range of 40–50 m. This test in general demonstrates the effectiveness of horizontal wells in lowering leachate level of MSW landfills. The obtained experience can be useful for civil projects that have similar concerns of draining the ground water.

Cite

CITATION STYLE

APA

Hu, J., Ke, H., Chen, Z. Y., Lan, J. W., Zhan, L. T., & Chen, Y. M. (2019). Installation and performance of horizontal wells for leachate level control in tianziling MSW landfill, China. In Environmental Science and Engineering (pp. 118–126). Springer Berlin Heidelberg. https://doi.org/10.1007/978-981-13-2224-2_15

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free