Mitsubishi latest coal fired USC boiler technology (CFE pacifico 700MW)

0Citations
Citations of this article
2Readers
Mendeley users who have this article in their library.
Get full text

Abstract

Mitsubishi Heavy Industries, Ltd. (MHI) has successfully completed commissioning work for CFE (Comisión Federal de Electricidad) Pacifico 700 MW coal-fired unit in March 2010 which is the first supercritical unit in Latin America. This supercritical boiler was designed with state of the art technologies such as low NOx burners, high fineness pulverizers, advanced vertical furnace wall technology and so on. Especially the advanced vertical furnace wall technology with some improvements is a key technology to realize swift load changes such as 5% load per minute ramping rate with assuring dynamic characteristics. Recently the requirement of the high efficiency and the swift load changes for the power boilers has been increased so that even a coal-fired unit needs flexible operation characteristics for balancing variety of power sources. One of the challenges for the swift load change is to keep the furnace wall metal temperature low during the load change, which the advanced vertical furnace wall could realize. The report describes the features of the unit and commissioning result including load swing test results in details. © Tsinghua University Press, Beijing and Springer-Verlag Berlin Heidelberg 2012.

Cite

CITATION STYLE

APA

Hashimoto, T., Sakamoto, K., & Fujita, M. (2012). Mitsubishi latest coal fired USC boiler technology (CFE pacifico 700MW). In Cleaner Combustion and Sustainable World - Proceedings of the 7th International Symposium on Coal Combustion (pp. 651–654). Springer-Verlag Berlin Heidelberg. https://doi.org/10.1007/978-3-642-30445-3_131

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free