Site 75

  • Tracey J
  • Sutton G
  • Nesteroff W
  • et al.
N/ACitations
Citations of this article
6Readers
Mendeley users who have this article in their library.

Abstract

Time on hole: 1 day, 1 hr, 00 min Position: 2°16.639'N, 101°26.766'W Bottom felt (rig floor, m; drill-pipe measurement): 3832.0 Distance between rig floor and sea level (m): 11.3 Water depth (drill-pipe measurement from sea level, m): 3820.7 Total depth (rig floor, m): 3849.2 Penetration (m): 17.2 Number of cores (including cores with no recovery): 2 Total length of cored section (m): 17.2 Total core recovered (m): 2.4 Core recovery (%): 13.8 Time on hole: 17 hr, 45 min Position: 2°16.638'N, 101°26.763'W Bottom felt (rig floor, m; drill-pipe measurement): 3832.0 Distance between rig floor and sea level (m): 11.3 Water depth (drill-pipe measurement from sea level, m): 3820.7 Total depth (rig floor, m): 3842.3 Penetration (m): 10.3 Number of cores (including cores with no recovery): 1 Total length of cored section (m): 10.3 Total core recovered (m): 1.0 Core recovery (%): 9.9 Igneous section: Depth top (mbsf): 0.0 Depth bottom (mbsf): 10.3 Nature: serpentinized peridotite and gabbroic rocks HOLE 895C Time on hole: 1 day, 1 hr, 15 min Position: 2°16.634'N, 101°26.774'W Bottom felt (rig floor, m; drill-pipe measurement): 3831.0 Distance between rig floor and sea level (m): 11.3 Water depth (drill-pipe measurement from sea level, m): 3819.7 Total depth (rig floor, m): 3868.9 Penetration (m): 37.9 Number of cores (including cores with no recovery): 4 Total length of cored section (m): 37.9 Total core recovered (m): 5.7 Core recovery (%): 15.1 Igneous section: Depth top (mbsf): 0.0 Depth bottom (mbsf): 37.9 Nature: serpentinized peridotite and gabbroic rocks HOLE 895D Time on hole: 6 days, 4 hr, 30 min Position: 2°16.635'N, 101°26.777'W Bottom felt (rig floor, m; drill-pipe measurement): 3832.0 Distance between rig floor and sea level (m): 11.3 Water depth (drill-pipe measurement from sea level, m): 3820.7 Total depth (rig floor, m): 3925.7 Penetration (m): 93.7 Number of cores (including cores with no recovery): 9 Total length of cored section (m): 93.7 Total core recovered (m): 20.0 Core recovery (%): 21.4 Igneous section: Depth top (mbsf): 0.0 Depth bottom (mbsf): 93.7 Nature: serpentinized peridotite and gabbroic rocks HOLE 895E Time on hole: 3 days, 21 hr, 15 min Position: 2°16.787'N, 101°26.792'W Bottom felt (rig floor, m; drill-pipe measurement): 3764.0 Distance between rig floor and sea level (m): 11.5 109

Cite

CITATION STYLE

APA

Tracey, J. I. Jr., Sutton, G. H., Nesteroff, W. D., Galehouse, J., Von der Borch, C. C., Moore, T., … Beckmann, J. P. (1971). Site 75. In Initial Reports of the Deep Sea Drilling Project, 8. U.S. Government Printing Office. https://doi.org/10.2973/dsdp.proc.8.110.1971

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free