Development of safety plan based on work breakdown structure to determine safety cost for precast concrete bridge construction projects. Case study: Girder erection with launching gantry method

11Citations
Citations of this article
49Readers
Mendeley users who have this article in their library.

Abstract

In Indonesia, there have been many accidents happening in the precast bridges projects. Separate budgets are not specifically provided in implementing OSHMS or Occupational Safety and Health Management Systems. The main purpose of the study is developing safety plan based on work breakdown structure to determine safety cost for precast concrete bridge construction projects. This research is using a survey research method. The respondents are construction safety experts. Descriptive analysis is selected to analyse the variables. The results of the study are safety plan to each hazards and activity, finding the safety costs components based on WBS in order to improve the OHSMS and reduce the rate of accidents. The safety plan is developed based on WBS and can be adapted to determine safety cost components and it can be easier in calculating the real safety costs.

Cite

CITATION STYLE

APA

Saputra, P. D., & Latief, Y. (2020). Development of safety plan based on work breakdown structure to determine safety cost for precast concrete bridge construction projects. Case study: Girder erection with launching gantry method. Civil Engineering and Architecture, 8(3), 297–304. https://doi.org/10.13189/cea.2020.080313

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free