DSP based implementation of current mode fuzzy gain scheduling of PI controller for single phase UPS inverter

1Citations
Citations of this article
2Readers
Mendeley users who have this article in their library.
Get full text

Abstract

This paper presents Control of UPS inverter Using Fuzzy Gain Scheduling of PI Controller. This control scheme has Double Loop Current Mode Control Scheme in core. This scheme includes two control loops as inner and outer control loops. Inner control loop uses inductor current of inverter filter as feedback while outer control loop uses inverter output voltage as feedback. Fuzzy Logic Controller, FLC is used to adjust the voltage loop proportional-integral, PI controller parameters. The voltage error, e and its derivative, de are used as input variables of the FLC. In this study, Fuzzy Gain Scheduling of PI Controller is simulated digitally using PSIM simulation package and C++ and implemented using Texas Instruments, TI's TMS320LF2407 DSP (Digital Signal Processor) under linear, rectifier type nonlinear and fluorescent loads. And the results show that Fuzzy Gain Scheduling of PI Controller can provide low Total Harmonic Distortion, THD and better regulation quality especially under rectifier type nonlinear and fluorescent loads. © Springer-Verlag Berlin Heidelberg 2006.

Cite

CITATION STYLE

APA

Bolat, E. D. (2006). DSP based implementation of current mode fuzzy gain scheduling of PI controller for single phase UPS inverter. In Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics) (Vol. 4251 LNAI-I, pp. 841–849). Springer Verlag. https://doi.org/10.1007/11892960_101

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free