Flowshop scheduling with machine deterioration based on job sequences

  • Ruiz-Torres A
  • Rosas J
  • Jurburg D
N/ACitations
Citations of this article
9Readers
Mendeley users who have this article in their library.

Abstract

This paper addresses the two-machine permutation flowshop problem with deterioration. The objectives are minimizing the makespan and the average tardiness. Jobs have a baseline process time in each machine and have a due date. The actual time to process a job depends on the machine performance level at the start of each job, which is a function of the previously processed jobs and their wear/deterioration effect on the machine. The article proposes multiple heuristics and a comprehensive set of experiments.  The results indicate that as a group, the heuristics generate solutions that are very close to the optimal for both criteria. Furthermore, no heuristic approach is dominant for all experimental conditions, thus heuristic selection to solve practical problems should be based on the specific problem characteristics.

Cite

CITATION STYLE

APA

Ruiz-Torres, A., Rosas, J. A., & Jurburg, D. (2021). Flowshop scheduling with machine deterioration based on job sequences. INGENIERÍA Y COMPETITIVIDAD, 23(2), e20410099. https://doi.org/10.25100/iyc.v23i2.10099

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free