Scheduling railway traffic at a construction site

7Citations
Citations of this article
9Readers
Mendeley users who have this article in their library.
Get full text

Abstract

We consider the problem of rescheduling trains in the case where one track of a railway section consisting of two tracks in opposing directions is closed due to construction activities. After presenting an appropriate model for this situation we derive a polynomial algorithm for the subproblem of finding an optimal schedule with minimal latenesss if the subsequences of trains for both directions outside the construction site are fixed. Based on this algorithm we propose a local search procedure for the general problem of finding good schedules and report test results for some real world instances. © 2005 Springer-Verlag Berlin Heidelberg.

Author supplied keywords

Cite

CITATION STYLE

APA

Brucker, P., Heitmann, S., & Knust, S. (2005). Scheduling railway traffic at a construction site. In Container Terminals and Automated Transport Systems: Logistics Control Issues and Quantitative Decision Support (pp. 345–356). Springer Berlin Heidelberg. https://doi.org/10.1007/3-540-26686-0_15

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free