The ITER magnet systems: Progress on construction

14Citations
Citations of this article
20Readers
Mendeley users who have this article in their library.
Get full text

Abstract

Construction of the ITER magnet systems has been started at the end of 2007 following the signature of the first procurement arrangements (PA) for the toroidal field (TF) conductors. Six ITER members are involved in the share of the ITER magnet components and, to date, eighteen PA between the ITER Organization and six domestic agencies have been signed. Substantial progress towards full-scale construction has been achieved with the placement of the first large manufacturing contracts, the production of several tens of tons of advanced Nb3Sn and NbTi strand, and the set-up of large cabling and jacketing facilities. The detailed design of the coils and support structures has also been finalized. The qualification of the fabrication processes for the TF coils and poloidal field (PF) coils has been initiated. The detailed design of the central solenoid (CS) coils is being developed. The design of the correction coils (CCs) with their support structures has been finalized, as well as for the TF gravity supports and clamps of the PF coils. The manufacture of prototypes of the feeder lines and current leads has been started, while ITER is in charge of the procurement of the required magnet instrumentation. This paper provides a progress report on the ITER magnet construction as per December 2010. © 2014 ITER.

References Powered by Scopus

The ITER magnet system

265Citations
N/AReaders
Get full text

The ITER toroidal field model coil project

111Citations
N/AReaders
Get full text

Results of a new generation of ITER TF conductor samples in SULTAN

58Citations
N/AReaders
Get full text

Cited by Powered by Scopus

Magnetic-confinement fusion

187Citations
N/AReaders
Get full text

Compact steady-state tokamak performance dependence on magnet and core physics limits

44Citations
N/AReaders
Get full text

Introduction to the focus on superconductivity for energy

21Citations
N/AReaders
Get full text

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Cite

CITATION STYLE

APA

Sborchia, C., Bonito Oliva, A., Boutboul, T., Chan, K., Devred, A., Egorov, S., … Wu, Y. (2014). The ITER magnet systems: Progress on construction. Nuclear Fusion, 54(1). https://doi.org/10.1088/0029-5515/54/1/013006

Readers' Seniority

Tooltip

Researcher 8

62%

PhD / Post grad / Masters / Doc 5

38%

Readers' Discipline

Tooltip

Physics and Astronomy 5

42%

Engineering 4

33%

Materials Science 2

17%

Energy 1

8%

Save time finding and organizing research with Mendeley

Sign up for free